Laserfiche WebLink
I.AECTOR <br />ENGINEERING, INC. <br />® GEOSYNTHETIC RECEIVING AND MANUFACTURING/CONFORMANCE LOG <br />(one type of material per sheet) <br />Project Name: Forward LF FU -06 Material Type:. 8 oz/sy Geotextile <br />C7 <br />Project No: 021605.07 <br />Review by: _ MA -C <br />Receiving <br />Date <br />Lot Number <br />Roll Number <br />Prefix and Suffix <br />Sheet <br />Area <br />(sy) <br />Cummulative MQC <br />(sf) Received <br />Date <br />CQA <br />MCC Conformance <br />Results Test Date Ship <br />(P/F) (or NP if not <br />perform) <br />Conformance <br />Results (P/F <br />or NA) <br />Approved for <br />Installation <br />(YIN) <br />12 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />9,000 23 -Jun -06 <br />P 5 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />18,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />27,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />[19542 <br />9,000 <br />36,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />45,000 23-0un-06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />54,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 <br />9,000 <br />63,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1953 1 <br />9,000 <br />72,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1954 <br />9,000 <br />81,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1955 <br />9,000 1 <br />90,000 23 -Jun -06 I <br />P 5 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1956 <br />9,000 <br />99,000 23 -Jun -06 I <br />P <br />Y <br />12 -Jun -06 1 <br />519757 <br />13022 1957 <br />9,000 <br />108,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1958 <br />9,000 <br />117,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1959 <br />9,000 <br />126,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1961 <br />9,000 <br />1 135,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1962 <br />9,000 <br />144,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />1 519757 <br />13022 1963 <br />9,000 <br />153,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1964 <br />9,000 <br />162,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1965 <br />1 9,000 <br />171,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1966 <br />9,000 <br />1 180,000 23 -Jun -06 <br />P 5 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1967 <br />9,000 <br />189,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1968 <br />9,000 <br />198,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1969 <br />9,000 <br />207,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1970 <br />9,000 <br />216,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1972 <br />9,000 <br />225,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1973 <br />9,000 <br />234,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1974 <br />9,000 <br />243,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1975 <br />9,000 <br />252,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1976 <br />9,000 <br />261,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1977 <br />9,000 <br />270,000 23 -Jun -06 <br />P 5 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1978 <br />9,000 <br />279,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1979 <br />9,000 <br />288,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1980 <br />9,000 <br />297,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1981 <br />9,000 <br />306,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1983 <br />9,000 <br />315,000 23 -Jun -06 <br />P <br />Y <br />12 -Jun -06 <br />519757 <br />13022 1984 <br />9,000 <br />324,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1985 <br />9,000 <br />333,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1986 <br />9,000 <br />342,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1987 <br />9,000 <br />351,000 23 -Jun -06 <br />P <br />Y <br />13 -Jun -06 <br />519757 <br />13022 1988 <br />9,000 <br />1 360,000 1 23 -Jun -06 <br />P 5 -Jun -06 <br />P <br />Y <br />1 of 5 <br />