17ECTOR <br /> ENGINEERING, INC. <br /> DAILY CONST FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 7 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste May 23, 2006 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> In-place native soils Scat. clouds, It. breeze, high 50's to high 70's Michael Strobel <br /> Equipment on site: <br /> 2x637 scrapers, D6 dozer, 815 compactor, water truck, 12G blade <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. Continued exposing the east edge of the liner in FU-05, using the backhoe, loader and 2 laborers. <br /> 2. Continued construction of the new temporary berms in the north area of FU-06, using scrapers to <br /> deliver and place material from the berm removed from the east side of FU-05.. <br /> 3. Continued placement for the 5:1 slope above the bench; scrapers place material from the "wedge" <br /> ® stockpile in FU-06; the D6 dozer trims the outside slope and works in the borrow. <br /> II. Testing <br /> 1. Completed pounding Proctor Compaction on sample SGP-1. <br /> 2. Performed 6 FDT's (Field Density Tests-nuclear method) in compacted Subgrade soils placed on the <br /> 5:1 slope; tests SG-1 through SG-6 indicate "passing"results similar to previous work here. <br /> 3. Performed 2 FDT's in compacted fill for the new tempory berms in the north area of FU-06; both tests <br /> indicate passing results. <br /> III. Conversations <br /> ® With Larry Simms, Gwinn Construction, re: Discussed scraper quantities, load times, etc. <br /> Prepared BjA Reviewed By: �C <br /> 0" 1 of 1 4/23/03,Rev.0 <br />