Laserfiche WebLink
VE TOR <br /> IV ENGINEERING,INC. <br /> ® DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Report Sequence <br /> Forward WMU FU-06 02.1605.07 20 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Stockton Allied Waste June 10, 2006 Saturday <br /> General Contractor: Liner Contractor: Project Engineer: Reviewed By: <br /> Gwinn Construction n/a Monte Christie <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Simms n/a <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Import Clear, It. breeze (N ), high 50's-low 90's Mike Strobel <br /> Equipment on site: <br /> 3x637 scrapers, D6 dozer, 815 compactor, water truck, excavator, rock truck, loader, backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> I. Construction <br /> 1. No activity. <br /> II. Testing <br /> 1. Type Daily Construction Reports. <br /> 2. Pound Subgrade Proctor sample SGP-7. <br /> ® 3. Washed Subgrade samples SGP-5, 6 and 7. <br /> III. Conversations <br /> • None listed. <br /> Prepared B Reviewed By: nC <br /> 1 of 1 4/23/03,Rev.0 <br />