My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Laboratory Services <br />124Jd Lan® Rka div®., $uits C Csas Vafr°y, CA 05043 <br />(530) M.244a Fax(330) M-8553 <br />Test Method ASTM D -5321-B <br />ALLIED WASTEFORWARD LANDFILL P-i*dw 9 8601 1-93 8 8 <br />''''•' <— Board Spacers <br /><— Brown Clay Soil tsN 938A <br />t•! __ —> GSE 60 mil HPDE (TIS) BAH Clamped <br />Bt —> Concrete Board <br />'SPLACEMENT 7000 <br />SHEAR STRESS <br />st Normal <br />nl I Stress 6000 <br />27.8 i 4000 <br />rown ey , <br />tial Water Content <br />18.3% <br />inial Ory Density: <br />105.7 pcf <br />1 Water Content(%) <br />2. 3. <br />9.8 17.0 <br />2000 <br />1000 <br />0_fK_ <br />0.0 <br />0.5 1.0 1.5 2.0 25 3.0 <br />HORIZONTAL DISPLACEMENT (inches) <br />1 AAD CONDITIONS: SHEAR DISPLACEMENT RATE: 0.04In/m117 <br />The -gap' between shear boxes was set at 80 mil (2.0 mm) <br />The test specimens were nooded during testing unless otherwise noted. <br />High Normal Stress (>5psa, was applied using air pressure. <br />Low Normal Stress (c5pst, was applied using dead weights. <br />The tests were terminated after 3.0' of displacement unless otherwise noted. <br />Tests were performed In general accordance with ASTM procedure 0S321-92 Method 8 using a Brainard -10 iman LG -112 direct shear machine <br />with an effective area of 12" x 12'. <br />ORIENTATION: <br />NORMAL STRESS <br />TOP BOX WITH SOIL <br />BOTTOM BOX W1 CONCRETE BOARD <br />fAL TEST NOTES: <br />Each specimen of HDPE was cut to 14' x 20- and clamped Into the lower shear box with the textured side up. <br />The soil was remolded In the upper box to approximately 92% of its maximum dry density at 6% above optimum water content. <br />Each test specimen was hydrated under 100 psf for 24 hours. <br />The consolidation load was staged in pressure Increments of 15 psi every 20 minutes up to the specified normal load, <br />consolidated for 2 hours and then sheared. <br />rt. 'Iodate end neauN tepnwentad a Uta pagat CAmt e'Pr*'e+ to fund Me fbaiiN d V0C" En <br />fa; N+ napectire teel(a) ntpetsnfd herwcn. and CAPnt ogroas b indemndy end boil Aa•mlera <br />Date: Enured ar. Revi°..sd By.- <br />12r29/98 <br />r12!29/98 xi <br />_ <br />Mc Acre ti.+M end aY °tl-W +er perDse ilt dwune anartg —of <br />M end p9ake aY &b;fy it a Kcoee at, Me &A owv dond * <br />Page 2 of 2 <br />j -i <br />IV* deft b <br />Lab Log: <br />9386 <br />• <br />• <br />55.6 <br />8000 <br />a <br />N 4000 <br />118.1 <br />17000 <br />w <br />Cr <br />f- <br />a <br />DISTLRE DATA: <br />o: 3000 <br />Q <br />W <br />8 CI So'I) <br />r� <br />rown ey , <br />tial Water Content <br />18.3% <br />inial Ory Density: <br />105.7 pcf <br />1 Water Content(%) <br />2. 3. <br />9.8 17.0 <br />2000 <br />1000 <br />0_fK_ <br />0.0 <br />0.5 1.0 1.5 2.0 25 3.0 <br />HORIZONTAL DISPLACEMENT (inches) <br />1 AAD CONDITIONS: SHEAR DISPLACEMENT RATE: 0.04In/m117 <br />The -gap' between shear boxes was set at 80 mil (2.0 mm) <br />The test specimens were nooded during testing unless otherwise noted. <br />High Normal Stress (>5psa, was applied using air pressure. <br />Low Normal Stress (c5pst, was applied using dead weights. <br />The tests were terminated after 3.0' of displacement unless otherwise noted. <br />Tests were performed In general accordance with ASTM procedure 0S321-92 Method 8 using a Brainard -10 iman LG -112 direct shear machine <br />with an effective area of 12" x 12'. <br />ORIENTATION: <br />NORMAL STRESS <br />TOP BOX WITH SOIL <br />BOTTOM BOX W1 CONCRETE BOARD <br />fAL TEST NOTES: <br />Each specimen of HDPE was cut to 14' x 20- and clamped Into the lower shear box with the textured side up. <br />The soil was remolded In the upper box to approximately 92% of its maximum dry density at 6% above optimum water content. <br />Each test specimen was hydrated under 100 psf for 24 hours. <br />The consolidation load was staged in pressure Increments of 15 psi every 20 minutes up to the specified normal load, <br />consolidated for 2 hours and then sheared. <br />rt. 'Iodate end neauN tepnwentad a Uta pagat CAmt e'Pr*'e+ to fund Me fbaiiN d V0C" En <br />fa; N+ napectire teel(a) ntpetsnfd herwcn. and CAPnt ogroas b indemndy end boil Aa•mlera <br />Date: Enured ar. Revi°..sd By.- <br />12r29/98 <br />r12!29/98 xi <br />_ <br />Mc Acre ti.+M end aY °tl-W +er perDse ilt dwune anartg —of <br />M end p9ake aY &b;fy it a Kcoee at, Me &A owv dond * <br />Page 2 of 2 <br />j -i <br />IV* deft b <br />Lab Log: <br />9386 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.