Laserfiche WebLink
Lan®rar®ry JerVjCeS <br />12438 tome Ree Dr", Suite C- Grass Valley, CA 95045 <br />(530) 272.2448 Far(530) 272.8553 <br />Test Method ASTM D -5321-B <br />,,va— VECTOR ENGINEERING °t I^l m•= FORWARD LANDFILL A* -'Ab- 986011-903A <br />6aAe <— Subgrade Soil ornac Board Spacers <br /><— CETCO Bentomat DN tSAI.. AZZ Not Clamped <br /><— GSE 60 mil HDPE (Textured up / Smooth Down) <br />—> GSE Single Sided Geocomposite (Geonet uo / Textile Down <br />SPLACEMENT <br />SHEAR STRESS <br />>t Normal <br />'7t I Stress <br />4000 <br />ial Water Content:I 1000 <br />19.5% <br />itial Dry Density: <br />101.3 pcf <br />Water Content:(%) <br />2. 3. <br />22.5 22.3 <br />0 <br />0.0 0.5 1.0 1.5 . 2.0 2.5 3.0 <br />HORIZONTAL DISPLACEMENT (inches) <br />Ls- BAH Not Clamped <br />tsm..- BAG <br />G CONDITIONS. <br />The "gap" between shear boxes was set at 80 mil (2.0 mm) <br />The test specimens were flooded during testing unless otherwise noted. <br />High Normal Stress (>5psi) was applied using air pressure. <br />Low Normal Stress (<5psi) was applied using dead weights. <br />The tests were terminated after 3.0" of displacement unless otherwise noted. <br />Tests were performed in general accordance with ASTM procedure D-5321-92 Method B using a Brainard-tGllman LG -112 direct shear machine <br />with an effective area of 12"x 12". <br />DR/ENTATION: <br />NORMAL STRESS <br />TOP 80X W/ SUBGRADE SOIL < GCL < HDPE <br />cw»to <br />BOTTOM BOX W1 FRICTION SAND < GEOCOMPOSITE <br />4L TEST NOTES: <br />Each specimen of Geocomposite was cut to 14" x 20" and clamped into the lower shear box with "channel clamps." <br />The soil was remolded in the upper box to approximately 90% of its maximum dry density, and 2 percent over optimum moisture content. <br />The GCL specimens were hydrated for 24 hrs under 100 psf, loaded into the test specimen for 2 hours under normal stress and then sheared. <br />The initial water content of the GCL was 24.8% and final water contents were: pl.1: 104.19%, pt.2: 99.56%i pt.3: 82.58%. <br />The test was performed in a "wet" or "flooded" condition. <br />late and <br />motive <br />10/27/98 <br />on this page. Client agrees to limit the liability of Vector Engineering. Inc. Iran client and ell other parties for <br />hereon, and Client agrees to indemnrly and hold harmIra <br />less Vector n end.agatnst an liability in excess of r <br />)yReviewed By Y17t, <br />W <br />Page 2 of 2 <br />Lab Log: <br />903A <br />11 <br />27.8 <br />4000 <br />3000 <br />55.6 <br />8000 <br />a <br />A <br />118.1 <br />17000 <br />w <br />2000 <br />)ISTURE DATA: <br />to <br />tY <br />!Subgrade Soil) <br />N <br />ial Water Content:I 1000 <br />19.5% <br />itial Dry Density: <br />101.3 pcf <br />Water Content:(%) <br />2. 3. <br />22.5 22.3 <br />0 <br />0.0 0.5 1.0 1.5 . 2.0 2.5 3.0 <br />HORIZONTAL DISPLACEMENT (inches) <br />Ls- BAH Not Clamped <br />tsm..- BAG <br />G CONDITIONS. <br />The "gap" between shear boxes was set at 80 mil (2.0 mm) <br />The test specimens were flooded during testing unless otherwise noted. <br />High Normal Stress (>5psi) was applied using air pressure. <br />Low Normal Stress (<5psi) was applied using dead weights. <br />The tests were terminated after 3.0" of displacement unless otherwise noted. <br />Tests were performed in general accordance with ASTM procedure D-5321-92 Method B using a Brainard-tGllman LG -112 direct shear machine <br />with an effective area of 12"x 12". <br />DR/ENTATION: <br />NORMAL STRESS <br />TOP 80X W/ SUBGRADE SOIL < GCL < HDPE <br />cw»to <br />BOTTOM BOX W1 FRICTION SAND < GEOCOMPOSITE <br />4L TEST NOTES: <br />Each specimen of Geocomposite was cut to 14" x 20" and clamped into the lower shear box with "channel clamps." <br />The soil was remolded in the upper box to approximately 90% of its maximum dry density, and 2 percent over optimum moisture content. <br />The GCL specimens were hydrated for 24 hrs under 100 psf, loaded into the test specimen for 2 hours under normal stress and then sheared. <br />The initial water content of the GCL was 24.8% and final water contents were: pl.1: 104.19%, pt.2: 99.56%i pt.3: 82.58%. <br />The test was performed in a "wet" or "flooded" condition. <br />late and <br />motive <br />10/27/98 <br />on this page. Client agrees to limit the liability of Vector Engineering. Inc. Iran client and ell other parties for <br />hereon, and Client agrees to indemnrly and hold harmIra <br />less Vector n end.agatnst an liability in excess of r <br />)yReviewed By Y17t, <br />W <br />Page 2 of 2 <br />Lab Log: <br />903A <br />11 <br />