My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />9 July 1997 <br />TESTING EQUIPMENT, MATERIALS AND PROCEDURES <br />Summary of Materials, Tests and Results <br />National Seal Company received two 5 gallon containers of site -soil to be included in direct shear testing <br />for the Forward Landfill, WMU D-97 project. Other materials to be included in the testing were NSC <br />60 -mil single sided textured HDPE geomembrane (S06F307A-4F2308BO3), and Bentofix NW GCL <br />(22119). In addition, a peel test was performed on the GCL sample in accordance with ASTM D 4632 - <br />91, Standard Test Method for Grab Breaking Load and Elongation of Geotartiles. The following <br />profiles. were evaluated under normal stresses of 4000, 8000 and 13000 psf (the high normal stress <br />desired for this project of 15000 psf is not attainable on NSC's shear device): <br />1. Textured side of membrane / Site -soil <br />2. Textured side of membrane / GCL / Site -soil <br />Below is a summary of the tests and the results. <br />C <br />39.4 lbf <br />Test Apparatus <br />National Seal Company's test apparatus was manufactured by GeoSyntec Consultants. The upper box <br />measures 12" x 12" x 3". The length of the lower box is 14". This allows the 12" x 12" test area 2" of <br />displacement. An electric motor supplies the shearing force and displaces the lower box relative to the <br />upper stationary box. The upper box is held stationary by a load cell which in turn measures the shear <br />stresses. In these particular tests the normal stresses were applied by regulated air. <br />Preparation of Specimens <br />The soil for test series I was to be compacted to a relative compaction of 90% at a water content of 2 to 5 <br />percent above optimum (modified Proctor, ASTM D 1557). The Proctor analysis was provided with the <br />interface shear strength testing protocol. The maximum dry density was 118.9 pcf, and the optimum <br />water content was 13.0%. A dry density and moisture content of 107.01 pcf and 16.92% respectively, <br />were used. The soil was compacted into the bottom box of the shear device. The membrane was <br />Profile <br />Peak Angle <br />Residual Angle <br />Test Series <br />(degrees) <br />(degrees) <br />Textured side of membrane <br />I <br />Site Soil <br />30.1 <br />27.5 <br />Textured side of membrane <br />Left to the <br />2 <br />GCL <br />21.8 <br />discretion of the <br />Site -soil <br />engineers <br />Peel Test <br />Bentofix NW; Average of 3 specimens <br />39.4 lbf <br />Test Apparatus <br />National Seal Company's test apparatus was manufactured by GeoSyntec Consultants. The upper box <br />measures 12" x 12" x 3". The length of the lower box is 14". This allows the 12" x 12" test area 2" of <br />displacement. An electric motor supplies the shearing force and displaces the lower box relative to the <br />upper stationary box. The upper box is held stationary by a load cell which in turn measures the shear <br />stresses. In these particular tests the normal stresses were applied by regulated air. <br />Preparation of Specimens <br />The soil for test series I was to be compacted to a relative compaction of 90% at a water content of 2 to 5 <br />percent above optimum (modified Proctor, ASTM D 1557). The Proctor analysis was provided with the <br />interface shear strength testing protocol. The maximum dry density was 118.9 pcf, and the optimum <br />water content was 13.0%. A dry density and moisture content of 107.01 pcf and 16.92% respectively, <br />were used. The soil was compacted into the bottom box of the shear device. The membrane was <br />
The URL can be used to link to this page
Your browser does not support the video tag.