My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11, <br />4gradvIcapm <br />41- �4VV\Y i ►> <br />1.1 WORK INCLUDED <br />A. This section covers the Work necessary to construct the earthwork for Waste <br />Management Unit (WMU) FU -06 at the Forward Landfill. Specifically, it <br />includes excavation, general earthfill, and grading; placement of subgrade fill, <br />construction of a compacted clay liner, construction of a granular drainage layer, <br />construction of a protective operations layer, construction of LCRS trenches, <br />excavation and backfilling of anchor trenches, and construction of liner <br />termination berms. Miscellaneous minor earthwork may also be required, as <br />directed by the OWNER <br />1.2 DEFINITIONS <br />A. Acceptance Testing: Tests performed by the QA/QC CONSULTANT to verify <br />the in-place properties of constructed components. <br />B. Completed Course: The completed course is defined as a course or layer that is <br />ready for the next layer or the next phase of construction. <br />C. Construction Quality Assurance (CQA) Manual: A program of activities that will <br />provide adequate confidence that materials and workmanship meet the <br />requirements of the Contract and fulfill the project objectives. CQA includes <br />quality acceptance tests and procedures that are outlined in the CQA Manual. The <br />CQA Manual is an attachment to these Contract Documents. <br />D. DESIGN ENGINEER: LEWIS ENGINEERING <br />E. EARTHWORK CONTRACTOR: The entity that will perform all earthwork as <br />required by these Specifications. <br />F. Imported Material: Material obtained by the CONTRACTOR or OWNER from <br />offsite sources. <br />G. OWNER: Forward, Inc. <br />H. QA/QC CONSULTANT: Consulting engineering firm directing, coordinating, or <br />providing subsurface soil investigations, soil testing laboratory, geosynthetics <br />testing laboratory, monitoring of construction, and construction surveillance. The <br />QA/QC CONSULTANT is technically accountable to Forward, Inc. and <br />responsible for certification of construction according to the specifications <br />outlined herein. The QA/QC CONSULTANT consists of the CQA Officer and <br />CQA Inspection Personnel. The CQA Officer has final authority on decisions to <br />be made by the CQA Inspection Personnel. <br />I. Subgrade: Surface upon which fills or other features, including geosynthetics, are <br />to be constructed. <br />J. Unclassified: The nature of materials to be encountered has not been identified or <br />described herein. <br />Forward Landfill WMU FU -06 <br />02300 1 EARTHWORK <br />
The URL can be used to link to this page
Your browser does not support the video tag.