My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_4
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:51:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_4
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_4.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Coordinate with the Earthwork Contractor and Owner to perform excavation verification <br />surveys upon completion of excavating operations. Verify corrective action measures as <br />determined by verification surveys. Verification surveys will also be used to determined <br />limits of excavation for measurements and payment applications. Submit copy of <br />verification surveys to the Construction Manager. <br />3.4.3 General Earthfill and Subgrade Fill <br />• Verify that construction staking is performed before work and that survey bench marks <br />with elevations are secured outside the work area. <br />• Perform visual and manual soil classifications (ASTM D2488) to verify that material <br />source is suitable for earthfills. Verify that the material is free of organic and oversized <br />materials. Perform classifications continually during excavation of borrow materials. <br />• Perform moisture -density relationship testing (ASTM D1557) to determine the maximum <br />dry density and optimum moisture content of earthfill materials. Perform tests at testing <br />frequencies specified in Section 3.2.2. <br />• Verify that earthfill materials are placed and compacted in accordance with the <br />Specifications. If a sheepsfoot compactor is not used, verify that the top of each <br />compacted lift is scarified before placing the subsequent lift. <br />• Perform nuclear density -moisture tests ASTM D2922 and ASTM D3017 to verify that <br />t3' ( ) fY <br />each lift is compacted as required by the technical specifications. Perform tests at testing <br />frequencies specified in Section 3.2.2. <br />• Verify that soil materials that are too wet for proper compaction per Specifications are <br />properly aerated and processed to bring the moisture content of the material into the <br />acceptable range of the optimum moisture content. <br />• Verify that earthfill soils that are too dry for proper compaction per Specifications are <br />properly moisture conditioned and processed to bring the moisture content into the <br />acceptable range of the optimum moisture content. <br />• Verify that desiccated earthfills are properly repaired or removed before placing <br />subsequent lifts. <br />• Verify that final earthfill surfaces are free of ruts, gouges, and other features that might <br />contribute to erosion and sediment run-off. <br />• During earthfill operations field verify lines, grades, and dimensions using hand-held <br />levels and inclinometers, range poles and measuring tapes. <br />Page 21 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.