Laserfiche WebLink
SIGNATURE PAGE <br /> Vector Engineering, Inc. (Vector) provided construction quality assurance services <br /> during the construction of the northern portion of WMU FU-06 at the Forward <br /> Landfill. The following final construction certification report was prepared by <br /> Vector and is b reby submitted to the Regional Water Quality Control Board <br /> (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and <br /> geosynthetic engineering practices applicable at the time the report was prepared. <br /> Vector makes no other warranties, either expressed or implied, as to the <br /> professional advice provided under the terms of this agreement, and as described in <br /> this report. Our recommendations consist of professional opinions and conclusions <br /> based on our testing and inspection program performed during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, <br /> the northern portion of WMU FU-06 at the Forward Landfill has been constructed <br /> and completed in general accordance with the project plans and specifications. <br /> During the construction, Vector conducted observations and testing to determine <br /> that the construction was conducted in general accordance with the project plans <br /> and specifications. The conclusions of our observations and testing, together with a <br /> written narrative describing the personnel, scope, methods, procedures and results <br /> of our CQA services, have been included in this certification report. <br /> VECTOR ENGINEERING INC. <br /> ESSIp��` <br /> 10No.C58866 <br /> G <br /> 7 <br /> Monte A. Christie, PE, GE EXP,'> <br /> No. 058866 <br /> CQA Engineer J'l�$ <br /> R��®f CALF® <br />