Laserfiche WebLink
Northern Portion of WMU FU-06 Aug 2006 <br /> Forward Landfill Project No.021605.07 <br /> 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CQA) observations and <br /> activities performed by Vector Engineering, Inc. (Vector) for Forward, Inc. <br /> (Forward), during the construction of the northern portion of WMU FU-06 liner <br /> system at the Forward Landfill. The northern portion of WMU FU-06 overlies the <br /> interim final cover for the existing Austin Road Landfill. This interim final cover <br /> will serve as the base liner component for the northern portion of WMU FU-06. The <br /> interim final cover was completed and approved in November 2002. <br /> The construction of the northern portion of WMU FU-06 was concurrent with the <br /> construction of the remaining portion of WMU FU-06. This CQA report <br /> summarizes the completion of the northern portion of WMU FU-06. The CQA <br /> report for the remaining portion of WMU FU-06 will be submitted at the completion <br /> of construction. <br /> CQA activities included monitoring earthworks construction, geosynthetics <br /> installation, and collection piping installation. This final report contains detailed <br /> documentation that the construction and CQA activities associated with the <br /> northern portion of WMU FU-06, were constructed in accordance with approved <br /> clarifications and modifications thereto, as well as in general accordance with the <br /> following documents: <br /> • Title 27 of the California Code of Regulations; <br /> • Construction Drawings, WMU FU-06, Forward Landfill, Lewis <br /> Engineering, March 2006, <br /> • Technical Specifications, WMU FU-06, Forward Landfill, Lewis <br /> Engineering, March 2006, and <br /> • Construction Quality Assurance Manual WMU FU-06, Forward <br /> Landfill, Lewis Engineering, March 2006. <br /> Vector Engineering,Inc.•143E Spring Hill Drive•Grass Valley, CA 95945•(530)272-2448 <br /> -1- <br />