My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2006_6
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2006_6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:24 PM
Creation date
7/3/2020 10:52:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2006_6
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2006_6.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sampling And <br /> Analytical'Protocol <br /> The following protocols have been developed to increase the accuracy and comparability <br /> groundwater monitoring data. The purposes of establishing and following.the fied protocols <br /> the <br /> {I) to reduce sources of error that can be introduced duringP ols are <br /> �P�g and, (2) t® collect samples <br /> in a consistent manner so that data sets are'con le. Therefore, project goals for <br /> comparability and include followuig the Procedures described in this <br /> recti®n to the <br /> Cdent_possible. When field conditions necessitate a change from the established <br /> n chin protocols, the <br /> ger be implemented with maintenance of sampling :accuracy and daia set <br /> ,comparability as priorities. Any modification to the standard procedures delineated. <br /> tkts <br /> protocol necessitated by field conditions and the reasons gill be noted on the in <br /> Report(See Section 2.7).. Technicians Daily <br /> Depth To Water Measurements <br /> Depth to water mets will be made in all'the wells at the site prior to initiating <br /> and�P�g, including.wells that.are not to be sampled. .ZTxe Purgong <br /> P moments will be made four <br /> tunes a Year prior to initiating each sampling round. There are no p1=0mGt=Mt the site. The <br /> depth to water Measurements will be made consecutively,iris short a time as possible, to reduce.: �,) <br /> potential errors due to daily variations in the water table. <br /> -to-water (DTVI) will be m _in the well to within 1/100 of a foot using a <br /> conductivity-based water level indicator.' Measurements will be taken from the north ormarked <br /> side of the top of casing of each well. These mmia on die <br /> casings, have been surveyed by a <br /> 'eY rehaOe to mean.sea level ). In wells with dedicated pumps,the water level <br /> probe is inserted into the well through a hole in the well <br /> cable cap. The conductivity probe and <br /> will be <br /> in dein before and after mmiutibg the first well, and after each <br /> subsequent well. The same water level indicator will be used in each well. Depth to water <br /> MeasureM=t will be recorded on a field obsavation.sheet <br /> Monitoring Well Purging Prior To Sampling <br /> Groundwater-samples will ba collected from existingmonitoring wells at Forvrard LandfillAACr <br /> g the water ` gin <br /> o the well. This water will be purged using either dedicated pumps <br /> ora pn'8e.'pump that is decontaminated between each well, The following procedure will <br /> be used to purge the water standing m the well prior to sampling the wells: <br /> 23-493944-Folt23to " A-6 <br /> zM rietamd.,Inc. lily 14,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.