Laserfiche WebLink
FROM (FRO OCT 20 2006 11 :22/ST- 11 :20/N0. 6333050714 P 4 <br /> Project Name ,4VM 'E <br /> lau <br /> ).USpeCt0eS Name Skd iJ)L -Je_1 Sk fj,�pi I ENGINEERING <br /> Unit Tested LuM V-E <br /> Date to 1, '2-*0 <br /> ANNUAL LC RS GAS TEST INSPECTION <br /> (A)PRJE-TEST INSPECTION <br /> 1, Are all Potential conduits sealed properly? yes <br /> no <br /> 2. Do any potential conduits require repair? yesno )< <br /> 3. Ifany Of the potential conduits required repair please list- <br /> 4. Are any repairs needed to continue gas testing? yesno X <br /> 5. Total number of potential conduits that require repak-�k <br /> 6. If repairs are required, complete a Maintenance Work Order(MWO). <br /> Comments: Vq9 wvk AA-I�kt <br /> (B)GAS INJECnON PHASE <br /> Tracer Used: SWOP 6Y &YekffiA.,S .c Unit: W/11 Cz <br /> Start time of tracer gas injection: /V $7 <br /> Meter Start Reading: 44- 1 <br /> Stop time of tracer sw injection: Meter Stop Reading: <-ST,3 <br /> Total volume of ftwer gas injected(cubic feet) : 4/' 2, <br /> Averageflow rate of injected tracer gas(cubic feet per min): /,Do <br /> Cornments:—'7'PP4 V0kCk(A&-.% (k� gwAg,'rA Pvi*vr -to -q exp /�ipeW mn to <br /> Remedial Action Work Order Date Completed Signature <br /> Signature of Impector. <br /> Page I of 2 <br />