Laserfiche WebLink
q. Pre-protested ADC materials tE -sed will be 18innhes or less in dimension. <br /> r. The pre-processed treated auto shredder waste must be deployed in a manner that does not allow the mixing of the cover and t1u <br /> waste. The pre-processed treated auto shredder waste cannot be used during rainy weather or anticipated rainy weather. <br /> I. The ash and eemsnt kilo dust must be applied in such a manner as not to create voids or dust. <br /> L For shredded Smen material ADC,the following conditions must be met: <br /> • A track dozer is to be used to spread and coagea die grem makwial. <br /> ® The processed Sten material shall eat cogtok gmoff gm five(S)pwcent eollumination(plastic or paper bags,mix solid <br /> waste,or cor atsucdon and demottt � <br /> • <br /> The processed green material mustUve a of 6 inches acrd an ave rmgc compacted thickness of 12 inches <br /> U. The use of the ADC shall conform to all ordw ADC demonwation projsat as approved by the LEA and rrtaybe <br /> suspended or modified at any time for=fficietat MFAe. <br /> Y. If the site operator plans to use a new AM allowed by md dnwftd inti tide 27,tom,Section 20690,the operator must subtrut <br /> any proposed changes to the ADC program in aha foam of an RFI wnmdnmw 150 days pdOr to the anticipated change. <br /> w. The LEA reseryes the tight to require atld UNIa1 umasum to tailictlawdy control resulting frvm landfilling ac(ivics as <br /> needed <br /> x. The operator sball at alt times provide S&qua a to deal &M pmmpdy with operations at the site as needed <br /> Y. Tae operator shall provide at all tithes adequate munben and typeea of opamble equipment for compaction and placement of the �'• <br /> waste and cover at the facllity. <br /> z. Aa adequate water supply for dust and 111MOWFICAsion"beavailsilkatan dmes during the operation of thin facility.The " <br /> water supply trust be acceptable to the local bre judWicdois and de LE& <br /> an. Additional Wormation concerning the design and tion of the be furnished upon request and within the time <br /> frame specified by the LEA:.The operator must n9ply* my infWmeian the LEA dcems necessary to conduct sn <br /> inspection or to review and rewrite a Solid Waste <br /> bb. Thc LEA most rcceivc RL)MICatron from the hdlfgy QFMW 68 hum prior 10 VC131ing on a Slto4ay. <br /> A <br /> 9 d b9£B IbZ l09 'ON/l0.51 '1S/50. 5 L 9002 L L OM M NO I iVI I NVS ISMAS AS '1N00 d1130 W083 <br />