Laserfiche WebLink
1 <br /> Sampling Equipment <br /> Imedmas sans l° <br /> 8 P m8 Probes were used to monitor subsurface gases at the landfill <br /> �cter, <br /> Each probe consists of a Mootnt Ion YS-inch diameter stainless steel i ` - . <br /> g' pipe, / tech holes <br /> staggered every 2 inches at the bottom 18 incites to allow for gases-to migrate into the prof, A <br /> pointed tip was welded to the end of the probe for better penetration. <br /> A ball valve and brass fitting were installed at the top of each probe to contain gas pressures and <br /> "tate aitrument hook-up to the probe.The valves were left closed e-kcept d <br /> or ' ent reading.Each probe is tagged with a brass plate and identified as_GP monitoring <br /> through } <br /> AGA 90 Landtec Iafra-red•Gas Analyzer was used to monitor methane, carbon.dioxide.(CO.,), <br /> and oxygen(02)levels at each robe location.The anal ` <br /> probe Y was calibrated for methane, CO2,and <br /> Og prior•to use in the field_Calibration.logs are.included.in afm report.- <br /> Gas Monitoring E <br /> Ambient air measurame nts of metfiaue, o i - <br /> xygen, carbon dioxide;and barometric-pressure• <br /> taken at each gas probe location. Those readings wcrt recorded and-the yi <br /> connected to-the probe. The valve was opened and grobe gas pressure moments were taken._ <br /> The probe was then- purged for. two_ probe volumes_ Readings•were theta collected at <br /> approximately 30- to 60-second mtervats, m ._a stable.- <br /> reading was .obfiainexh: Thee <br /> masmernents of methane, oxygen, carbon dioxide,and ambient barometric pressure were there <br /> recorded. Monitoring was also conducted at various locations in three buiid'ang sites for the <br /> Presence of methane gas Monitoring was conducted at the office trailer at the entrance to the <br /> landfill, trailer boxes at the service shop, and trader boxes at the transfer building. These <br /> locations were monitored for any gas pockets at the foundation and near any opening from the - <br /> floor sxtch as piping holes,electrical conduits,or Boor cracks. <br /> -LYSR ETERS <br /> Lysime-ters were sampled wing the following standard protocol: <br /> l- Prior to sampling lysimcters,the pre urC-vacuum equipment is checked and cl=cd-. <br /> 849-FO 1\231OR32i A•12 test�•ky <br /> 2000 !4,2000 <br /> .tom'. <br />