My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2007_18
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2007_18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:25 PM
Creation date
7/3/2020 10:52:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2007_18
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2007_18.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
594
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. e <br /> ArCE ® J1X A <br /> KLEIWCILD AaYYi =Ti <br /> ST✓4®L <br /> The Sampling and Analysis Plan (Meintelder,Nov',,-mberl, 1994) describes how Forward, <br /> conducts groundiwater vaonito&g for A. The mfozxuaxiaA contained Yn Inc. <br /> Cs sections related to sail the Plan <br /> sampling and analysis m the lggg postclosure Plan, <br /> Addendum #1 and Addendum #2. The &scussion of er <br /> proceduses"dis in this groundwat .�� methods and <br /> appendix,Meinfelder 1-field Activities Protocol,arc an excerpt of the <br /> More comprehensive Sampling and Anabfsis Plan. <br /> GR® WATER MONITORMG- <br /> Monitoring Wells <br /> Equipment <br /> The groundwater monitoring wells at Forward arc equipped with dedicated <br /> submerged Pimps for <br /> Ping and collection groundwater samples.. The field tee ciw pe r&rming the$rouuidwacer- <br /> a <br /> - monitoring will have a list of cquipmemwith which t <br /> t that.should be available t <br /> o complete the <br /> moniwring_ The necessary egedpment-is rsted below This list in <br /> eludes acdzal egmp�nt used M <br /> to purge aad sample the wells in addition to personal.Prrot ctive gear that .must be.warn for <br /> Protection and to redike the pbtemtial for cross contamination of the welds andsampl,m Someof <br /> the equipment used <br /> various imt rumerrts which rem cah`bra orx. Calr'bratiozn <br /> procedusrs arc discusssod below. <br /> Calt'bratiou Procedures <br /> Many of the rrleterS that arc used in the field must be calibrated to pro&=mrmble results. The <br /> following calibration rationale,procedures,and fregae acy for the <br /> cants. <br /> :VS7ater Levcl,�ndicator - - - <br /> Vater kvcl indicators meat be cxlibr� regularly to assure that data is not being measured - <br /> incorrectly due to the cable stretching. To calibrate the water level indicator the cable is nm out <br /> to Its entire length and measured agaim4st a tape measure. The Q Point is the point on the probe <br /> which completes the circuit when contacted by the water. This completed circuit Causes the <br /> 23-483849-FA 1123101t32S A•I July 14,2000 <br /> 2M xk1alclQet.lac. <br />
The URL can be used to link to this page
Your browser does not support the video tag.