Laserfiche WebLink
collection. However,due to the limited sample volumes, lysimeter samples were only <br /> 0 analyzed for select general chemistry constituents and/or VOCs. As shown in Table 2-6, <br /> two VOCs were measured above the PQL in the lysimeter samples collected during the <br /> third quarter 2007 monitoring period. <br /> 2.1.6 Surface Water Monitoring <br /> Site run-on and run-off control facilities are designed to effectively channel surface water <br /> to site stormwater/sedimentation ponds. According to the Operations Manager,no <br /> surface water was discharged from the facility during the reporting quarter. During the <br /> third quarter 2007 monitoring period surface water stations FSW-1 and FSW-2 were <br /> sampled on August 15, 2007. Table 2-7 summarizes the analytical results for surface <br /> water samples collected at the Forward Unit. A comparison of upgradient (FSW-2)to <br /> downgradient(FSW-1) surface water samples indicates generally similar concentrations <br /> suggesting that the landfill operations are not impacting surface water quality. <br /> 2.1.7 Leachate Monitoring <br /> Leachate sumps are inspected for the presence of leachate and observations are recorded <br /> at least weekly by Forward Landfill personnel. If leachate is detected in a sump, it is <br /> pumped into the surface impoundment(WMU F) for evaporation. During the third <br /> quarter 2007, leachate was observed at holding areas WMUD-93/94, WMU D-02, <br /> WMU FU-03,WMU FU-04,WMW FU-05, and WMU FU-06. The other holding areas <br /> were reported to be dry by Forward Landfill personnel. Freeboard at WMU-F ranged <br /> from approximately 8.50 feet to 9.25 feet during the third quarter 2007 monitoring <br /> period. Appendix A presents copies of the leachate logs and the freeboard observation <br /> logs. <br /> Leachate samples were collected on a monthly basis and analyzed in the field for pH and <br /> specific conductance. The results of monthly field monitoring measurements for the third <br /> quarter 2007 are presented in Table 2-8. <br /> Value Engineering conducted a gas test of the leachate collection and removal system <br /> (LCRS)on August 23,2007 at the Forward Unit. The test results indicate that an open- <br /> air conduit is present across the LCRS units, and no excessive leachate is backed up in <br /> the drainage layer or sump of the LCRS units. A summary of the test results is provided <br /> in Appendix A. <br /> 2.2 SUMMARY <br /> Groundwater quality conditions beneath the Forward Unit during the third quarter 2007 <br /> monitoring period are generally similar to those observed in previous monitoring periods. <br /> Eight new historical intrawell maximum values were measured in samples collected from <br /> groundwater monitoring wells during the third quarter 2007 monitoring period. <br /> Excluding suspected laboratory/field contaminants, estimated trace-level VOCs were <br /> measured in wells MW-10,MW-14, MW-16, and MW-21; and one VOC was measured <br /> D:\2007 0043\ForwardAusdn sum07.doc <br /> - - 7 <br /> Geologic Associates <br />