Laserfiche WebLink
SECTION 2 <br /> Base and Finali s <br /> 2.1 General <br /> The limits of WMU FU-08 were determined based on the site's operational needs, the landfill site <br /> development plan(BAS et al.,2003),and the February 2007 site topographic map.The southern limit <br /> was set to maintain the main access road into the facility. The southern boundary of WMU FU-08 <br /> will eventually be connected to the northern boundary of WMU D-02. The northern limit in the <br /> northern portion of the cell was based on the northern extent of the former Austin Road Landfill top <br /> deck, with an allowance for a 25-ft access road.The western limit of WMU FU-08 connects to WMU <br /> FU-06 and the eastern limit is based on site operational considerations for airspace. <br /> The WMU FU-08 grading plan and liner and LCRS sections and details are included in the <br /> Construction Drawings for the development of WMU FU-08 (Appendix A). Permanent access roads <br /> and surface drainage facilities will be constructed as the WMU meets final grades. <br /> 2.2 Liner aes <br /> Design criteria and reasoning to develop the grading plan includes: <br /> • Title 27 requires a minimum 5-foot barrier between waste in WMU FU-08 and groundwater. <br /> Additionally, the site WDRs require that no waste be discharged below an elevation of 7 feet <br /> above MSL. The lowest elevation of the WMU FU-08 base lining system is 18.1-ft MSL (at the <br /> top of operations layer) and is located in the southern portion of the cell at the eastern boundary. <br /> This elevation is significantly above the WDR requirement of a minimum elevation of 7 feet <br /> MSL. <br /> • Based on the "Forward Landfill Groundwater Elevation Evaluation East of WMU FU-06" and <br /> the "Forward Landfall Expansion, Groundwater Elevation Evaluation" (GeoLogic Associates, <br /> 2007) (see Appendix B), the maximum high groundwater elevation underlying the area east of <br /> WMU FU-06 is anticipated to be minus 6-feet MSL. In the RWQCB's letter dated 14 December <br /> 2007 (see Appendix B), the RWQCB concurred with GeoLogic Associate's evaluation of high <br /> groundwater elevation. Forward is planning to amend the WDRs to state that the minimum <br /> elevation for refuse disposal should be at minus 1-ft MSL, which is 5-feet above the maximum <br /> high water table. <br /> • The southern portion of WMU FU-08 will be graded to drain to east-west trending leachate <br /> collection pipes that lead to temporary sumps. The maximum drainage distance to the pipe is <br /> approximately 150 feet(see the Construction Drawings in Appendix A). <br /> • As outlined in the Preliminary Closure and Postclosure Maintenance Plan(CH2M HILL, 1994e), <br /> abrupt differential foundation settlement is not anticipated in the onsite soils forming the base <br /> grades of the landfill. The estimated maximum differential foundation settlement is 2 feet in <br /> WMU FU-08 REPORT 2-1 <br />