SECTION 5 <br /> Containment ye <br /> The southern portion of the WMU FU-08 containment system consists of a liner and LCRS on the <br /> base of the unit and a composite side slope liner on the northern excavation slope. The northern slope <br /> in the southern portion of the cell also incorporates an interface liner to separate Class III wastes in <br /> the former Austin Road Landfill from the overlying Class II wastes to be placed in WMU FU-08. <br /> The northern portion of WMU FU-08 is located on the top deck of the former Austin Road Landfill. <br /> The interim final cover serves as the base liner for this portion of the cell. A LCRS will be placed <br /> over the interim final cover. Leachate will drain to header pipes located along the southern <br /> termination berm and then routed via a solid 3-inch HDPE pipe to temporary leachate storage tanks. <br /> Once the northern and southern portions of WMU FU-08 are constructed and approved for disposal, <br /> the liners and LCRS in the top deck area directly north of the southern portion of WMU FU-08 will <br /> be connected and the leachate will drain to the sump in the southern portion of WMU FU-08. In the <br /> northern portion areas that are not directly north of the southern portion of WMU FU-08,the leachate <br /> will continue to be collected and routed to temporary leachate tanks. Once the WMUs to the east of <br /> WMU FU-08 are constructed, the liners and LCRSs in the northern and southern portions will be <br /> connected and leachate will flow to the LCRSs in the southern portion. <br /> The area where the northem and southem portions of VVMU FU-08 will be connected is a relatively <br /> flat area. The existing southern termination berm in the northern portion of WMU FU-08 will be <br /> removed in the connection zone. The clay liner in the northern portion of VVMU FU-08 will be <br /> transitioned to a 60-mil HDPE geomembrane and extended to meet the geomembrane liner in the <br /> southern portion of WMU FU-08. The gravel layer in the northern portion of WMU FU-08 will be <br /> extended to connect to the geocomposite drainage net at the top of the northern slope in the southern <br /> portion of WMU FU-08. Leachate from northern portion of WMU FU-08 can then flow directly into <br /> the southern portion of WMU FU-08 and to the sump. Because the connection area is relatively flat <br /> and is underlain by refuse in the former Austin Road Landfill, a geogrid is incorporated in the <br /> connection area to support the overlying liners and LCRS systems. <br /> Once the northern portion of WMU FU-08 is approved for disposal, Class III refuse will be placed <br /> above the northern portion. The Class III refuse will extend a minimum of 50-ft to the south of the <br /> boundary between the northern and southern portions and the southernmost Class III refuse face will <br /> be sloped to the south. <br /> The base liner system for the southern portion of WMU FU-08 consists of the following, from bottom <br /> to top: <br /> • Prepared subgrade; <br /> • Minimum 2-foot thick compacted clay liner with a maximum field hydraulic conductivity of I x <br /> 10-7 cm/sec; <br /> • 60-mil,double-sided textured HDPE geomembrane liner; <br /> • Cushion geotextile; <br /> WMU FU-08 REPORT6 5-1 <br />