Laserfiche WebLink
SECTION 6 <br /> Summary <br /> This report presents the construction documents and supporting design criteria required for <br /> completion of WW FU-08 at the Forward Landfill. Design calculations have been performed and <br /> construction documents prepared to demonstrate that the design of this unit complies with Forward's <br /> WDRs, and Title 27 requirements. <br /> These Design and Construction Documents have been prepared under the supervision of Sangeeta P. <br /> Lewis, whose seal as a Registered Professional Engineer in the State of California is affixed below. <br /> .S <br /> �®QROFESsj l <br /> SANGEETA P.LEWIS RCE 47735 C/VIL <br /> TF F CAiEF <br /> x. <br /> WMU FU-08 REPORT6 6-1 <br />