My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_19
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_19
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_19.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 INTRODUCTION <br /> 1.1 Purpose <br /> This Construction Quality Assurance(CQA)Manual has been prepared for Forward,Inc.(Forward) <br /> by a Registered Civil Engineer in accordance with Title 27,California Code of Regulations(CCR), <br /> Division 2, Sections 20323 and 20324, titled "CQA Plan and CQA Requirements." This manual <br /> describes CQA procedures for construction of the liner and leachate collection and removal system <br /> (LCRS)for Waste Management Unit FU-08(WMU FU-08). The CQA Manual outlines the specific <br /> field and laboratory testing and monitoring procedures required to demonstrate that WMU FU-08 is <br /> constructed in accordance with Title 27 requirements. <br /> The southern portion of WMU FU-08 is designed to comply with the construction standards of Title <br /> 27 by using a composite liner and blanket LCRS. The northern portion of WMU FU-08 overlies the <br /> interim final cover for the Existing Austin Road Landfill. The interim final cover for the Existing <br /> Austin Road Landfill was constructed in the fall of 2002 and consists of a 2-ft thick foundation layer, <br /> 1-ft thick clay liner, and 1-ft thick vegetative layer. The vegetative layer(stripped of vegetation)in <br /> combination with the clay liner for the interim final cover will serve as the base liner for WMU FU- <br /> 08. A CQA Report for the interim final cover was submitted and approved by the RWQCB(Final <br /> Construction Quality Assurance Reportfor Closure Construction ofthe Austin Road Portion ofthe <br /> Forward Landfill,Vector Engineering,2002). Following placement of refuse in the northern portion <br /> of WMU FU-08, an interface liner will be placed on the south facing refuse slope. <br /> Following the completion of the work for WMU FU-08, the Quality Assurance/ Quality Control <br /> (QA/QC) Consultant will prepare a final CQA Report. The CQA Report shall be submitted to the <br /> Owner within 20 days of construction completion. The purpose of the CQA Report is to document <br /> that the materials and construction processes comply with the WMU FU-08 design and regulatory <br /> requirements. As-built drawings and a discussion on the refuse fill stability of WMU FU-08 based <br /> on the actual interface shear strength test results obtained during the CQA testing program shall also <br /> be included. <br /> 1.2 Project Description <br /> Lewis Engineering designed WMU FU-08 in accordance with Forward's Waste Discharge <br /> Requirements(WDR Order No. R5-2003-0049),as well as applicable state and federal regulations. <br /> The provisions of particular importance regarding the design are: <br /> • The WMU FU-08 lining and leachate collection and removal system(LCRS) design <br /> shall conform to construction standards of Title 27 by using a composite liner and <br /> blanket LCRS. <br /> • WMU FU-08 will be designed,operated, and maintained to prevent inundation, <br /> ® washout, erosion, and slope failure resulting from flooding caused by a 24-hour storm <br /> with a 1,000 year return period. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.