My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_19
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:53:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_19
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_19.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
467
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES: <br /> ................. ...... <br /> .......... . <br /> x I AS DESCRIBED IN THE SPECIFICATION <br /> ............ (SECTION 02535),THE CONTRACTOR SHALL <br /> CONSTRUCT CROSSING POINTS OVER <br /> --SHT-10- <br /> ------ TIONS WHERE <br /> LEACHATE PIPES AT THE LOCA <br /> THE CONTRACTOWS TEMPORARY ROADS <br /> CROSS THE PIPES. <br /> X <br /> 1.7 <br /> X 4' 2. CONTOURS SHOWN WITHIN THE EDGE OF <br /> r �;�SEE NOTE 7 SEE NOTE 7 SEE GEOMEMBRANE LINED AREA REPRESENT THE <br /> ELEVATION OF THE HOPE GEOMEM3RANE <br /> CONTRACTOR SHALL MAKE NECESSARY <br /> ADJUSTMENTS TO ALLOW FOR THE <br /> THICKNESS OF COMPONENTS UNDERLYING <br /> THE HOPE GEOMEMBRANE SUCH AS THE CLAY <br /> X 86.5 x 87.1 x 87.6 x x 86.7 LINER. <br /> 34NCH DIA <br /> / ) / / // / ; 3.THE TOPOGRAPHY SHOWN IS BASED ON A FEB <br /> iri <br /> PERFORATED =RATE. I j <br /> HOPE PIPE(TYP) 1� 1 2D07 AERIAL SURVEY.THE TOPOGRAPHY K4,S <br /> HOPE PIPE(TYP) -------- SINCE BEEN MODIFIED IN SOME PORTIONS OF <br /> x THE WORK AREA.THE CONTRACTOR WILL <br /> x <br /> X 6. -4 SURVEY THE WORK AREA PRIOR TO <br /> x CONSTRUCTION. <br /> T <br /> 1 f <br /> ------------ 4.CONTRACTOR SHALL REMOVE EXISTING Q- <br /> CHANNEL AND DISPOSE ONSITE AS DIRECTED <br /> I <br /> if <br /> DETAIL <br /> C:::D < <br /> BY OWNER <br /> S. CONTRACTOR SHALL ROUTE 34NCH NON <br /> x 85.7 85.0 y- 84.6 X <br /> x 84.9 3,3 PERFORATED PIPE TO A TEMPORARY <br /> LEACHATE TANK(SUPPLIED BY OWNER), <br /> PROVIDE NECESSARY PIPE SUPPORTS, <br /> FITTINGS,AND VALVES AS DIRECTED BY <br /> J <br /> OWNER. <br /> .2 <br /> til <br /> ------------- <br /> x 83,7 6. IF EXISTING SOUTHERN TERMINATION BERM is <br /> PIPES VStg;i� LESS THAN 3-FT HIGH,PLACE ADDITIONAL <br /> 82.4- CONNECT <br /> _pit: WYE <br /> CONNECT AND EXTEND <br /> COMPACTED EARTH FILL TO RAISE THE BERM <br /> 3-INCH <br /> HEIGHT TO A MINIMUM 3-FT. <br /> 14 <br /> I PEr <br /> HOPE GRAVEL TRENCH X V <br /> 7. EXTEND LCRS PIPE THROUGH TERMINATION <br /> /,X36 <br /> BHT <br /> BERM GEOMEMBRANE USING HOPE BOOT. <br /> ty it ! i <br /> X 8 0.4 7 <br /> BHT 8. THE CONTRACTOR SHALL PROTECT THE <br /> X2 <br /> x 78.6 <br /> x 8'/4 <br /> EXISTING WMU FU-06 LINER SYSTEM <br /> X �Z. THROUGHOUT WMU FU-08 CONSTRUCTION. <br /> V) <br /> X 'R <br /> 9. THE CONTRACTOR SHALL VERIFY THE <br /> X <br /> LOCATION OF THE TOE OF THE EXISTING <br /> OD <br /> ZZ: <br /> o" 0) <br /> SOUTH.NTERMINATION BM AFTHETOE <br /> OF THE SOUTHERN TERMINATION BERM <br /> M <br /> x 78,9 x 7&BI <br /> V <br /> z 2 <br /> 6,5,2 "a <br /> 'SHTIO BLENDS INTO THE SLOPE,THE CONTRACTOR <br /> X 78,6 UNIFORMLY SHALL BASE GRADE ON THE NORTHERN TOE C14 <br /> 0 00 <br /> FROM SOUTHERN TO <br /> OF THE SOUTHERN TERMINATION BERM. 0) <br /> SOUTHERN TERMINATIO %N < <br /> N BERM i.3 - ---------- <br /> ------- EMMNTIN 10.CONTRACTOR SHALL REGRADE,AS < 0) <br /> C DF-suaGRADefu-L SLOPE, <br /> m-tc <br /> EE$LQIEIt' -) C"' <br /> C4 <br /> -------- NECESSARY,TO MAINTAIN POSITIVE FLOW <br /> TOWARDS DOWNDRAINS. Of- <br /> X 78// ------ <br /> is 00 <br /> APPROXIMATE ------- <br /> 11.REGRADE AREA AROUND SOUTHERN 0)< c <br /> -.CREST OF SOUTHERN <br /> cy) <br /> X 34NC-HNW TERMINATION AT THE TOP OF CHANNEL TO <br /> jTRFORA1W IN MAINTAIN POSITIVE FLOW TO THE EAST. <br /> ..--4SEEMTE4=1-:: <br /> PE <br /> NEdr USING J <br /> POINTS------NZE <br /> CONSTRUCTION CONTROL PO <br /> L <br /> I POINT NO. NORTHING EASTING ELEV z <br /> TEMPORARY LEACHATE TAW X16 2143718.5 636=7.1 19.1 <br /> X.. <br /> ' ' I• j i 1 j ! 1 i / !I i//, (SEE NOTE 5) X17 2143758.6 6362365.8 UJ <br /> SHT 19-8 <br /> ui <br /> 0 <br /> X18 2143734.7 6361975.8 71.7 <br /> X33 72. X19 2143758.5 6362375.8 22.0 <br /> z <br /> 38.; x I <br /> T < c <br /> IX I tilit <br /> SEE X20 21437842 8362375.8 34.0 S <br /> -If�................. z <br /> Lu <br /> 41�7=j 63M75.8 35.0 c) < <br /> X U) z Q <br /> < <br /> X22 2144001.1 6362375.8 712 <br /> t 1 <br /> X23 2144004.6 6361975.8 80.2 <br /> 0- x X24 2144239.4 6361975.7 85.7 Lu <br /> SHT 6-� 27.11 <br /> X25 2144474.3_ 6361975.7 90.0 <br /> STING X26 2144614.1 636MZ71 92.0 <br /> `A\ <br /> -Av" X27 2144615.3 6362585.9 92.1 U) <br /> M <br /> X28 2144620A 6362975.6 92.0 uj <br /> 29,4 X29 2144525.9 6363203.6 852 <z U) <br /> Amn <br /> X30 2144271.0 0 <br /> N -;;'ti - CL <br /> -34 r 6363171.1 82.0 IL <br /> X31 2144177A 6363019.2. 76.0 <br /> z <br /> X32 21439724 6362686.3 73.6 <br /> oo <br /> 720 z <br /> • X33 :�925 =;31 z cr <br /> all if f A % .0 < 9L <br /> < <br /> f 25.0 2E .4 <0 <br /> X X34 <br /> NOTE:ELEVATIONSZ Z: <br /> < <br /> if <br /> X22 TO X34 INDICATE EXISTING SURFACE <br /> LLJ <br /> < J <br /> BASED ON 2DD7 TOPOGRAPHY. F-Qf Lo <br /> V1 <br /> LEGEND <0 a- <br /> ix 1� U) <br /> z <br /> X 26,5 x 2 5.3 APPROXIMATE LIMIT OF WMLJ <br /> FU-08 CONSTRUCTION <br /> W, <br /> 0 <br /> �.J�' -`-.._--- � :%•\`•`;• `S� � J J;I r i � �-/��`\„'`'_��L`��'�� lZl�\ 'lj`";i t's'i', ` ,,t'1 <br /> i-oo�\ x 24.4 <br /> 2., N <br /> -J- <br /> ......... . . . <br /> MATCH LINE (SEE SHEET 3) 0 50 100 ISO Sheet-4-of 0 <br /> Rev LL <br />
The URL can be used to link to this page
Your browser does not support the video tag.