Laserfiche WebLink
SEE DETAIL r2""\ -- ---- -------- <br /> SHT 6 WMU FU-WWELD EXISTING <br /> PROTECTIVE / 60-rtll DOUBLE TEXTURED 3' 644W1 DOUBLE TEXTURED\ <br /> OPERATIONS LAYER PROTECTIVE / HDPE GEOMEMBRANE MIN / HOPE GEOMEMBRANE <br /> GEOCOMPOSITE (SEE NOTE 1) OPERATIONS LAYER if _ <br /> bi <br /> DRAINAGE NET 6'PERFORATED FILTER GEOTEXTILE ' <br /> COLLECTION PIPE u <br /> HDPE LEACHATE _ GRANULAR DRAINAGE <br /> 1 1'MIN // \ MATERIAL WMU FU-08 2 EXISTING <br /> CLAY LINER MIN CLAY LINER <br /> (NOTE 8) (NOTE 8) / <br /> APPROX2 - ------ --------� <br /> .: v <br /> 1'MIN <br /> Q <br /> GEOSYNTHETIC 1'MIN <br /> CLAY LINER o' ———— EDGE OF EXISTING <br /> GEOMEMBRANE <br /> 5 MIN 7 MIN o <br /> JI 11 T MIN _ 10, <br /> 11� APPROX <br /> 60-ml SINGLE TEXTURED 1 60 rtff DOUBLE TEXTURED _ <br /> EXTRUSION WELD / GEOTEXTILE <br /> FiLTF.'.R FILL SLOPE <br /> HDPE GEOMEMBRANE HDPE GEOMEMBRANE m <br /> (SEE NOTE 2) \ PROTECTIVE PLYWOOD REMOVE SHEETING AND <br /> �� - :Lti � c <br /> / CLAY LINER OPERATION LAYER PROTECTIVE GEOTEXTILE F.X+STING PROTECTIVE o <br /> 10'MIN APPROX 1Y FILTER GEOTEXTILE GENERAL OPERATIONS LAYER U) <br /> CUSHION (SEE NOTE 7) \ / 3 <br /> GEOTEXTILE z; J E9Ri'Hr€€..L <br /> PROX <br /> SECTION .__z.: �_�ra <br /> i. <br /> NORTH SIDE SLOPE LINER-BASE LINER TRANSITION S� ...... <br /> DRAINAGE z._— 1` <br /> NTS MATERIAL VARIES `�—F--—�''-. _... _—....,—....._.._.._.—......._. 2 R'EN <br /> CLAY LINER CUSHION �^EDGE O= ,t EXISTING ¢ p <br /> GEOTEXTILE FX€S T'NG <br /> 60-"DOUBLE TEXTURED CLAY LINER ��L':X€STi2dG GRANULAR DRAINAGE O� m <br /> €.A T ERIAL <br /> PROTECTIVE HOPE GEOMEMBRANE CUS€.IO i 1 \" acv - <br /> PLASTICCOVERING GEJ:XTILE EXIS PG z f=mz to I <br /> (BY OWNER) �� ..8?-nai'L OUBLE TEXTURED Z tom/)� 000 <br /> BENCH BERM GEOCOMPOSfTE (NOTE 3) WMU FU-08 WMU FU- -HOPE GEOVE BRANE <br /> DRAINAGE NET P x€s''€NG a <br /> SECTION ' CLAY LINER17 <br /> Qo <br /> N <br /> 2% CONN TO EXISTING LINER SYSTEM BHT 3 N z ai <br /> 3 N,Z._.__ <br /> NTS rn¢ L <br /> 1 <br /> 60 and SINGLE SIDE TEXTURED rn o_ <br /> HDPE GEOMEMBRANE <br /> ✓ GEOSYNTHETIC al <br /> 5 MIN CLAY LINER z 4 2 <br /> NOTES: W z iT o <br /> 15 MSN 1.THE FIRST 10'OF SIDE SLOPE PROTECTIVE OPERATION LAYER SHALL BE PLACED Z <br /> Lu <br /> SUBGRADE FILL OR <br /> BY THE CONTRACTOR USING A WHEELED LOADER WITH NO EQUIPMENT LOADING ON < � <br /> EXISTING GRADE SUBGRADE FILL THE SLOPE.SUBSEQUENT LIFTS OF SIDE SLOPE PROTECTIVE OPERATIONS LAYER Z v 3 a <br /> SHALL BE PLACED BY THE OWNER IN CONJUCTION WITH WASTE PLACEMENT TO A W a a <br /> CL <br /> MAXIMUM HEIGHT OF 1(Y ABOVE THE LEVEL OF REFUSE.SUBSEQUENT LIFTS SHALL (p Z <br /> ALSO BE PLACED WITH A WHEELED LOADER <br /> SECTION / t7 \ 2. PLACE TEXTURED SIDE OF GEOMEMBRANE AGAINST CLAY LINER OR GCE_ J o 6 J <br /> SLOPE BENCH BHT 3.4 0 Z <br /> NTS 3. OWNER SHALL PLACE A PROTECTIVE PLASTIC COVERING OVER THE GEOCOMPOSITE <br /> DRAINAGE NET.THE PROTECTIVE PLASTIC COVERING SHALL BE REMOVED(BY OWNER) <br /> BEFORE THE SIDE SLOPE OPERATIONS LAYER IS PLACED AGAINST THE GEOCOMPOSME V) <br /> DRAINAGE NEC.THE SIDE SLOPE PROTECTIVE OPERATIONS LAYER SHALL BE PLACED W <br /> 60-MU TEXTURED GC-OCOMPOSCCE IN CONJUNCTION WITH WASTE PLACEMENT(BY OWNER).TO A MAXIMUM HEIGHT OF 10' N <br /> HOPE GEOMEMBRANE DRAINAGE NET ABOVE THE LEVEL OF REFUSE.THE OWNER SHALL PLACE THE SIDE SLOPE OPERATIONS <br /> (SEE NOTE 5) (SEE NOTE 4) LAYER USING A WHEEL LOADER,WITH NO EQUIPMENT LOADING ON THE SLOPE.OWNER J a <br /> SHALL PROVIDE TEMPORARY ANCHORING OF PROTECTIVE PLASTIC COVERING.TEMPORARY J J <br /> T MIN f C C5 Oh3PO517= ANCHORAGE SHALL NOT DAMAGE UNDERLYING LINER o F <br /> i 00 <br /> DRAINAGE NET Z O W a <br /> 4. OVERLAP NEN/WMU FU-08 GEOCOMPOSITE DRAINAGE NEC AND EXISTING UNDAMAGED <br /> _ _fli <br /> _ WMU FU-06 GEOCOMPOSITE DRAINAGE NET A MINIMUM OF3 FEET AND SLAM. Z Lj ®_ <br /> of <br /> 1 _1' 1— 11 `S0 ratil TcX(LIMED 5. CONTINUALLY WELD NEW,WMU FU-08 HDPE GEOMEMBRANE TO EXISTING UNDAMAGED Q p ¢Q m <br /> GEOSYNTHETiC , HOPE GEOMEMBRANE WMU FUS HDPE GEOMEMBRANE. Z 0- <br /> CLAY LINER ? SUBGRAL?E 0 O Z <br /> (SEE NOTE 6) FILL i GEO'--NTHETIC 6. OVERLAP NEW WMU FU-08 GEOSYNTHETIC CLAY LINER AND EXISTING UNDAMAGED WMU FU-06 Q <br /> $......�...._ L_e $ CLAY L':NER U <br /> GEOSYNTHETIC CLAY LINER A MINIMUM OF 3 FEET. w <br /> BACKFILL4i1TI�L i V) F" <br /> SLURRY CEME?.Nr MIN <br /> M;XTUF3E 7. OVERLAP EXISTING UNDAMAGED GEOTEXTILE AND WMU FU-08 GEOTEXTILE A MINIMUM OF 2 FEET. <br /> ® WMU FU-08 I WMU FU-06 8. KEY NEW CLAY LINER INTO EXISTING CLAY LINER W <br /> Q. <br /> SECTION <br /> SIDE SLOPE LINER CONNECTION SHT3.4 $heetZOf11 <br /> NTS Rev LL <br />