Laserfiche WebLink
DnRODUCT'ON <br /> _ Leachate containment and removal systems are presently being constructed on L-.,d <br /> landfills, which were developed before low-permeability liners and leachate collection syste <br /> became a regulatory and industry standard of practice. These systems are being construc <br /> below proposed vertical expansions to reduce the infiltration of leachate generated within <br /> newly placed waste, into the underlying old landfills. <br /> A liner and leachate collection system constructed on an existing landfill is potentir <br /> subject to large differential settlements.: --The long-term performance of these systems is thu <br /> major design consideration. Large differential settlements within existing refuse may occur( <br /> to'the collapse or degradation of Large objects, which have been disposed of in the_old landt <br /> These settlements could result in tensile strains at the surface of a liner system. If the ten., <br /> -strains within the liner exceed the tensile capacity of the material, whether it is a soil o <br /> geomembrane, tension cracks or tensile failure will develop. Under extreme conditions, tenni <br /> cracks will reduce the effectiveness of the liner as a hydraulic barrier by providing a direct fl, <br /> path through the liner system. <br /> Differential settlements occurring below a liner and leachate collection system could a <br /> affect the slope at which the liner and leachate collection systems have been constructed. Aga <br /> under extreme conditions, this could result. in the reversal of leachate flow grades. If gra <br /> reversal takes place at the surface of a Iiner and leachate collection system, leachate w-" <br /> on the liner, and the potential for infiltration of the leachate into the old landfill will it.. .. <br /> This paper presents an approach to analyze the differential settlement at the surface o" <br /> liner system caused by the collapse of a void within an existing landfill. On the basis of tl <br /> analysis, a new design method is presented and described. This paper summarizes metho <br /> currently available to estimate "void-induced" differential settlements. One of these methods <br /> further discussed and an example using- this design method is provided. Conclusions a <br /> recommendations based on the proposed analysis and results are also presented. <br /> Current Design Practice Presently, two methods are being used to minimize the potent <br /> damage of a liner and leachate collection system constructed between an existing landfill and <br /> vertical expansion. These methods consist of either reinforcing the liner system with synthe, <br /> geogrids or improving the subgrade by stabilizing the in-situ refuse before constructing a lin <br /> and leachate collection system above it. <br /> Geogrid teinforcement is one of the techniques most frequently applied in these case <br /> The design of the reinforcement is based on the assumption that a void is Iocated immediate <br /> underneath the liner. The liner is then treated as a plate bridging over the void and carrying t) <br /> loading from the overlying waste. Structural geogrids are placed to support and protect 0 <br /> integrity of the liner system (12, 13). The design methodology used in geogrid reinforce �P <br /> is based on the tensioned membrane theory. When differential settlement takes pla. . .. <br /> 1498 -Vancouver,Canada-GeoMthedcs'93 <br />