Laserfiche WebLink
1. The pH, conductivity, and turbidity meters will be calibrated at a minimum at the <br /> begInning of each sampling day using commercially obtaibed.'standards. Calibration wi71 <br /> be checked two to three tunes during the day to evaluate the potential that the calibration <br /> is driffing throughout the day. -If instrument drift is detected in the field, the <br /> measurements taken during purging and sampling will be adjusted acconlingly. Example <br /> calibration Iogs arc included in.Ap ' dix'C.. During purging and sampling of the welts <br /> the instruments will be used in the same manner as during calibration. <br /> 2. Depth to water will be measured again, Prior to sampling, in each well as -described in <br /> Section 4.4.1 and recorded on the Purge Characterization,and Sample Log. The volume <br /> of groundwater in the well easing will be calculatedUs* the following equa$on(s)• <br /> 4-inch well.- '(Total Well Depth from the mark on the well casing (ft) - DTW (ft)) x <br /> 0_653 gal/fL <br /> .3., Prior to purging, the-water,will be-. -br using-a disposable'bailer that is ci mr7 <br /> ,enough to see through. Features such as immiscible layers will be noted and-measured. <br /> If irnmiscibie layers-arc observed the vrc not be purged prier to sampling_ <br /> 4_ The well will then be purged using the e _Due to the-fact that the pumps must <br /> purge water from depths as great as-70 to 80 feet below ground surfaces purge rates range <br /> fiom 114 to I gallon per minute. This-purge rate docs not appear to exceed the recharge - <br /> ratcs of the wells. Purge water will be discharged to-the ground (see Section 4.4.6)- <br /> Depth <br /> to watt'measurements will be taken paiodically duing pig- The purpose of <br /> these moments 3s to mon tar-dr-avdowm If a decrease in groundwater elevation is <br /> mooted,the purge rate will be 'tun(purge rate equals rage rate)is achieved. The frequ=cy of measurement will be-once every five minutes initially <br /> decreasing to once every on hour once equili-brium has been reached. <br /> If equilibrium cannot be reached,it will be necessary to purge the well to dryness. Purge. <br /> until less than 104/0 of the (miginal volume of vmtcr repzains in the well. Hand Wing <br /> may be requhvd to meet tWsobj6cdve. Monitor the DTW every 15 minutes to evaluate <br /> r=harge. Start sample collection whet either o fat of water has filled the well or-135 <br /> hours has elapsed since the end of purging. Collectvolatile organics no later than two <br /> hours after purging. Record all actions eats associated with purging a well <br /> dry on the Forge Characterization and Sample Log. <br /> 449-8 1123 OR325 A•7 July 14,2000 <br /> CWOkht 2000 Kkk ldcr,lac. <br />