Laserfiche WebLink
Guinn Construction <br /> 6533 Rosedale Hwy. Phone: (661)325-6109 <br /> Bakersfield,CA 93308 Fax: (661)325-5173 <br /> U.S.A. <br /> o: Allied Waste Industries Contact: Lochlin Caffey <br /> Address: 901 Bailey Road Phone: 925-458-9800 <br /> Pittsburg,CA 94665 Fax: 925-458-9891 <br /> Project Name: Forward FU-08 Bid Number: <br /> Project Location: Bid Date: <br /> Item# Item Description Estimated Quantity Unit Unit Price Total Price <br /> 01 Mobilization/Demobilization 1.00 LS $62,000.00 $62,000.00 <br /> 02 Provide Excavation Of WMU FU-08 21,200.00 CY $2.15 $45,580.00 <br /> 03 Provide General Earthfill(in All Areas Not Otherwise 46,800.00 CY $2.15 $100,620.00 <br /> Delineated,Such As Termination Berm,Access Ramp, <br /> Etc.) <br /> Includes Stripping Overburden From Borrow(20,000 <br /> Cy) <br /> 04 Provide Subgrade Fill(above existing cover soil and 160,500.00 SF $0.40 $64,200.00 <br /> refuse) <br /> Provide Grading And Subgrade Preparation 471,900.00 SF $0.10 $47,190.00 <br /> ® Provide Clay Liner-2'on cell floor 326,300.00 SF $0.50 $163,150.00 <br /> 07 Provide Granular Drainage Material(Southern Portion) 314,400.00 SF $1.40 $440,160.00 <br /> 08 Provide 6-inch Diameter SDR 1 I HDPE Leachate 2,350.00 LF $16.00 $37,600.00 <br /> Collection Pipe(Perforated) <br /> 09 Provide HDPE Tanks 3.00 EACH $7,500.00 $22,500.00 <br /> 10 Provide Coarse Gravel 725.00 CY $60.00 $43,500.00 <br /> Install Filter Geotextile Material 314,400.00 SF $0.05 $15,720.00 <br /> Install Protective Operations Layer-Floor+10'on 329,300.00 SF $0.15 $49,395.00 <br /> sloe p <br /> 13 Provide Bench Berm(Section G) 600.00 LF $20.00 $12,000.00 <br /> 14 Provide Slope Anchor Trench Excavation And Slurry 250.00 LF $30.00 $7,500.00 <br /> Cement Trenc ad h BUIS(ection E) <br /> 15 Provide Eastern Termination Berm(Section C) 930.00 LF $22.00 $20,460.00 <br /> 16 Provide Clay Earthfill Berm(Section D) 400.00 LF $20.00 $8,000.00 <br /> 17 Provide Perimeter Berm(Section Q) 535.00 LF $18.00 $9,630.00 <br /> 18 Provide Gen Earthfill Around HDPE Tanks(Sections J,K) 1.00 LS $9,000.00 $9,000.00 <br /> 19 Relocate Existing Channel 1.00 LS $7,500.00 $7,500.00 <br /> 20 Provide 4'x 8'x 1/4"Plywood Sheeting 1.00 LS $5,000.00 $5,000.00 <br /> Total Price for above Items: $1,170,705.00 <br /> Owner Furnished Materials <br /> 21 Deduct For Owner Furnished HDPE Pipe 1.00 LS ($21,279.07 <br /> ($21,279.07) <br /> 22 Deduct For Owner Furnished HDPE Tanks 1.00 LS ($10,037.21 <br /> ($10,037.21) <br /> Total Price for above Owner Furnished Materials Items: ($31,316.28) <br /> Total Bid Price: $1,139,388.72 <br /> Notes: •No provision has been made to extend the LFG Collector Pipe <br /> • Geosynthetics to be furnished and installed by others with the exception of the filter geotextile which is to be furnished by <br /> others and installed by Guinn. <br /> •Geogrid to be furnished and installed by others. <br /> •We reserve the right to renegotiate unit prices for direct cost increases arising from rising fuel prices. <br /> •No provision has been made to provide a performance&payment bond. <br /> . Highlighted unit prices were utilized in the Forward Landfill Closure Cost Estimate—Table 3 of PCPCMP Amendment No.3.See <br /> • Attached worksheet for conversion/calculation of item No.6. <br /> 5/19/2008 12:29:58 PM Pagel of2 <br />