Laserfiche WebLink
FORWARD LANDFILL <br /> PRELIMINARY CLOSURE/POST-CLOSURE MAINTENANCE PLAN <br /> AMENDMENT <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1.0 PRELIMINARY CLOSURE PLAN AMENDMENT 1 <br /> 1.1 Introduction 1 <br /> 1.2 Closure Sequencing 1 <br /> 1.3 Maximum Extent of Landfill That Will Ever Require Closure 5 <br /> 1.4 Closure Implementation 5 <br /> 1.5 Estimate of Closure Date 7 <br /> 1.6 Site Security 7 <br /> 1.7 Post Closure End Use 7 <br /> 1.8 Closure Cost Estimate 7 <br /> 1.8.1 Final Cover 8 <br /> 1.8.2 Final Cover Construction Quality Assurance <br /> Monitoring and Testing 8 <br /> 1.8.3 Drainage Control System 8 <br /> 1.8.4 Landscaping and Erosion Control 8 <br /> 1.8.5 Gas Control System 9 <br /> 1.8.6 Site Security 9 <br /> 1.8.7 Demolition 9 <br /> 1.8.8 Gas Migration Monitoring System 9 <br /> 1.8.9 Groundwater Monitoring System 9 <br /> 1.8.10 Engineering Design 9 <br /> 1.8.11 Construction Management 9 <br /> 1.8.12 Partial Final Closure and Post-Closure Maintenance <br /> Plan Preparation 9 <br /> 1.8.13 Contingency 9 <br /> 1.9 Post-Closure Maintenance Cost Estimate 10 <br /> 1.10 Demonstration of Financial Assurance 10 <br /> 1.11 California Environmental Quality Act Documentation 10 <br /> 2.0 PRELIMINARY POST-CLOSURE MAINTENANCE PLAN AMENDMENT 11 <br /> 3.0 PROFESSIONAL CERTIFICATION OF ACCURACY 13 <br /> FIGURES <br /> Figure 1 Closure Stage <br /> Figure 2 Closure Stage II <br /> Figure 3 Closure Stage III <br /> i <br /> Forward Landfill-PCPCMP Amendment No.3 <br /> Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\TOC Final.docx; <br /> Amend.No.3:7/10/2008 <br />