Laserfiche WebLink
topographic map will be generated to provide an up-to-date contour map of the <br /> disposal area. The settlement and lateral movement of each monument will then <br /> be recorded. <br /> Prior to a scheduled survey of the monuments, an inspection will be performed <br /> to ensure that the monuments are intact and usable. The monument will be <br /> cleared of all debris and vegetation to allow for visual location of the monument <br /> and accurate readings. Should a monument be damaged or missing, a new <br /> monument will be placed at that location so that the continuity of the previous <br /> survey data will be maintained. <br /> If a monument is within an area requiring regrading and/or other reconstruction, <br /> it shall be replaced at approximately the same horizontal location and a note <br /> shall be placed to identify the new elevation. <br /> Forward Landfill PCPCMP 4-6 <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec4.doc:5/21/02 BRYAN A.STIRRAT a ASSOCIATES <br />