Laserfiche WebLink
5.2.9 STRUCTURE REMOVAL/DECOMMISSIONING OF ENVIRONMENTAL <br /> CONTROL SYSTEMS <br /> This category includes costs for dismantling and removal of the fee scales and <br /> scale house including backfill of the pits and administrative office. <br /> 5.2.10 ENGINEERING DESIGN <br /> This category includes costs for the preparation of construction level engineering <br /> design plans and specifications for bid purposes. This cost is assumed to be five <br /> percent of the construction cost. <br /> 5.2.11 CONSTRUCTION MANAGEMENT <br /> The construction management cost for the Forward Landfill is based on the <br /> closure construction period. This cost is based on a 180-day construction <br /> schedule. <br /> Aft 5.2.12 FINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN (FCPCMPJ <br /> PREPARATION <br /> qW <br /> This category covers the cost to prepare the FCPCMP. <br /> 5.2.13 CONTINGENCY <br /> A 20 percent contingency factor has been added to the construction cost <br /> estimate. <br /> 5.3 POST-CLOSURE MAINTENANCE COST ESTIMATE <br /> The post-closure maintenance cost estimate has been prepared utilizing <br /> information contained in Section 4.0 and estimates of manpower, materials and <br /> equipment to maintain the Forward Landfill in compliance with current <br /> applicable regulations. <br /> Forward Landfill PCPCMP 5-3 <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec5.doc:5/21/02 BRYAN A.STIRRAT&ASSOCIATES <br />