My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 1:11:09 AM
Creation date
7/3/2020 10:54:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_26.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.2.9 STRUCTURE REMOVAL/DECOMMISSIONING OF ENVIRONMENTAL <br /> CONTROL SYSTEMS <br /> This category includes costs for dismantling and removal of the fee scales and <br /> scale house including backfill of the pits and administrative office. <br /> 5.2.10 ENGINEERING DESIGN <br /> This category includes costs for the preparation of construction level engineering <br /> design plans and specifications for bid purposes. This cost is assumed to be five <br /> percent of the construction cost. <br /> 5.2.11 CONSTRUCTION MANAGEMENT <br /> The construction management cost for the Forward Landfill is based on the <br /> closure construction period. This cost is based on a 180-day construction <br /> schedule. <br /> Aft 5.2.12 FINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN (FCPCMPJ <br /> PREPARATION <br /> qW <br /> This category covers the cost to prepare the FCPCMP. <br /> 5.2.13 CONTINGENCY <br /> A 20 percent contingency factor has been added to the construction cost <br /> estimate. <br /> 5.3 POST-CLOSURE MAINTENANCE COST ESTIMATE <br /> The post-closure maintenance cost estimate has been prepared utilizing <br /> information contained in Section 4.0 and estimates of manpower, materials and <br /> equipment to maintain the Forward Landfill in compliance with current <br /> applicable regulations. <br /> Forward Landfill PCPCMP 5-3 <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec5.doc:5/21/02 BRYAN A.STIRRAT&ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.