My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_26
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2020 1:11:09 AM
Creation date
7/3/2020 10:54:03 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_26
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_26.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 8 <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE SUMMARY <br /> 187.6-ACRE CLOSURE AREA <br /> ESTIMATED <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE COST <br /> 11 JENGINEERING DESIGN(7) <br /> 2%of construction cost 1 LS $183,945 <br /> Subtotal $183,945 <br /> 12 CONSTRUCTION MANAGEMENT(8) <br /> 4%of construction cost 1 LS $367,890 <br /> Subtotal $367,890 <br /> Total Construction Cost $10,442,528 <br /> Contingency 20% $2,088,506 <br /> Final Closure Plan Prep. $40,000 <br /> Total Closure Cost Estimate $12,571,034 <br /> Notes: <br /> (1) The unit costs for the synthetic final cover materials and installation,drainage control system features and erosion control are <br /> based on a recent bid(May 2008)prepared by Boston Pacific, Inc for remediation and closure work at the Jamestown Landfill located <br /> in the same general region(See Attachment No. 1). <br /> (2) Unit costs includes excavation,preparation and compaction of the foundation and vegetative layers. Earthwork pricing is based <br /> on a recent bid provided by Guinn Construction to Allied for their last lined cell to be constructed in 2008(See Attachment No. 1). Cost <br /> also assumed that all materials necessary for the foundation,low-permeable and vegetative layers will be obtained from an on-site <br /> borrow source. Cost also assumes 50%of total final area as slope and a slope factor of 3:1 horizontal to vertical. <br /> (3) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one-foot of soil would <br /> already be in place. Cost also assumes scarification and recompaction of the lower in-place foot of soil as part of the preliminary <br /> grading cost item. <br /> (4) Final cover construction quality assurance(CQA)is generally based on the actual number of construction days to complete the <br /> cap. Based on the closure implementation schedule,approximately 130 construction days will be needed to install the final cover over <br /> the 187.6-acre closure area. The per day CQA utilized for this estimate was provided by one of Allied's professional CQA consultants <br /> (Geologic Associates). The per day cost for a CQA professional,equipment,and vehicle is$1,500. Laboratory sampling and testing <br /> is based on quantities of final cover soil and synthetic in accordance with the sampling/testing frequency outlined in the CQA Plan in <br /> the 2002 PCPCMP and current regulations under 27CCR and the cost per test provided by Geologic Associates for earthwork and <br /> Precision Labs for synthetics. Geosynthetic testing frequencies are established by the Geosynthetic Research Institute and are <br /> completed at rate of 1 test every 100,000 sq ft. Laboratory costs are estimated to be$218,433. In addition,the final CQA report <br /> certifying proper installation of the cap is another$20,000. <br /> (5) All on-site structures associated with the landfill will be removed. An administration/maintenance office trailer,as well as an <br /> equipment maintenance area,will be utilized during the post-closure maintenance period. <br /> (6) No cost is included in this category because the system is/will be in-place at closure. Currently,there are no plans to expand <br /> the monitoring system. <br /> (7) Cost is for engineering design and preparation of construction documentation(plans and specifications)for bid purposes. <br /> (8) Cost is for monitoring contractors work,coordinating CQA activities,meetings,liaison between design engineers and <br /> contractors,etc. <br /> Forward Landfill PCPCMPR <br /> Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 8 Clos Cst;Amend No.4:8/7/2008 Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.