Laserfiche WebLink
TABLE 8 <br /> FORWARD LANDFILL <br /> CLOSURE COST ESTIMATE <br /> SUMMARY <br /> Item Estimated Unit <br /> Description Total <br /> No. Quantity Price ($) <br /> 9 ISTRUCTURE REMOVAL DECOMMISSIONING OF ENVIRONMENTAL CONTROL SYSTEM <br /> Demolition 1 LS $50,000 $50,000 <br /> Subtotal $50,000 <br /> 10 JENGINEERING DESIGN (5 1 LS $966,160 $966,160 <br /> Subtotal $966,160 <br /> 11 1CONSTRUCTION MANAGEMENT 1 LS $781,200 $781,200 <br /> Subtotal $781,200 <br /> 12 IFINAL CLOSURE AND POST-CLOSURE MAINTENANCE PLAN (FCPCMP) PREPARATION <br /> Report Preparation LS 1 $45,000 $45,000 <br /> Subtotal $45,000 <br /> Total Construction Cost $20,289,368 <br /> Contingency 20% $4,057,874 <br /> FCPCMP Preparation $45,000 <br /> Total Closure Cost $24,392,241 <br /> Assumptions: <br /> (1) Cover costs assume at least one foot of foundation material in place on the deck and slopes at closure. <br /> (2) Assumes 10 percent of VFPE area (10-foot on center spacing). <br /> (3) Assumes placement of up to 4 multiple-depth probes to a maximum depth of 50 feet, as necessary <br /> for coverage. <br /> (4) System to be in place prior to closure construction. <br /> (5) Cost is approximately five percent of total construction cost_ <br /> Forward Landfill PCPCMP <br /> L\Allied\2000.193\Reports\JT D-PC PC MP702Rev:c pc ostest.:5/21 j 02 <br /> Revision l: 7/8/02 Page 2 of 2 <br /> BRYAN A.STIRRAT S ASSOCIATES <br />