Laserfiche WebLink
Attachment 1 <br /> Final Closure Construction Cost Estimate for the Jamestown Landfill -2008 <br /> Item7 Boston Pacific, Inc. <br /> • <br /> No Item <br /> Unit Est.Qty Unit Price Total <br /> Mobilization LS 1 <br /> Tem orar Water Supply $201,800.00 $201,800.00 <br /> LS 1 $58,000.00 $58,000.00 <br /> construction Surveying LS 1 <br /> 4 Traffic Control $65,200.00 $65,200.00 <br /> S Temporary Erosion and <br /> LS 1 $20,400.00 $20,400.00 <br /> Sedimentation Control LS 1 $27,500.00 <br /> $27,500.00 <br /> 6 Construct Temporary Construction <br /> Entrance EA 2 $2,150.00 <br /> $4,300.00 <br /> _7 Cleaning and Grubbing ACRE 18 <br /> 8 Remove Existin Drainage S stem LS 1 $5,400.00 $97,200.00 <br /> $27,300.00 $27,300.00 <br /> 9 Disconnect, Protect and Reconnect <br /> Existing Leachate Piping LS 1 $4,560.00 <br /> $4,560.00 <br /> 10 Remove Existing Temporary <br /> Geos nthetic Slope Protection LS 1 $3,510.00 $3,510.00 <br /> Disposal of Geosynthetic Slope <br /> 11 Protection and Drainage Materials LS 1 <br /> $4,560.00 $4,560.00 <br /> On-Site <br /> 12 Removal of Existing Landfill Gas Wells EA 6 <br /> $325.00 $1,950.00 <br /> 13 Removal of Existing Landfill Gas Vents EA 18 <br /> $325.00 $5,850.00 <br /> 14 Excavate and Stockpile Existing I* -- <br /> Ve etative Soil La er CY 46,020 $2.68 $123,333.60 <br /> 15 Excavate and Stockpile Existing <br /> Monolithic Clay Layer CY 48,070 $2.55 $122,578.50 <br /> 16 Excavate and Stockpile Existing <br /> Foundation La er CY 18,025 $2.55 $45,963.75 <br /> 17 Excavate, Relocate and Compact <br /> Refuse CY 105,975 $3.94 $417,541.50 <br /> 18 Excavate, Process and Stockpile On- <br /> site Borrow CY 60,000 $8.20 $492,000.00 <br /> 19 Import Material from Off-Site Mine CY 15,000 $5.30 <br /> $79,500.00 <br /> 20 Pre are Buttress Foundation CY 850 $5.70 <br /> 21 Construct Buttress CY 37,500 $4,845.00 <br /> $2.90 $108,750.00 <br /> 22 Place and Compact Foundation Layer CY 40,398 <br /> $6.50 $262,587.00 <br /> 23 Install Passive Landfill Gas Wells VLF 700 $83.00 <br /> $58,100.00 <br /> 24 Passive LFG Vent/Well Surface <br /> Com letions EA 50 $290.00 $14,500.00 <br /> 25 Install Passive Landfill Gas Trenches <br /> and Vents LF 8,000 $26.10 $208,800.00 <br /> Install Low Permeability Barrier(40- <br /> 1,. <br /> mil Textured LLDPE Geomembrane) SF 726,462 $0.48 $348,701.76 <br /> Install Geocomposite Drainage Layer <br /> Double-Sided SF 726,462 $0.70 $508,523.40 <br /> 'ROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\13oston Pacific <br />