Attachment 1
<br /> Final Closure Construction Cost Estimate for the Jamestown Landfill -2008
<br /> Item7 Boston Pacific, Inc.
<br /> •
<br /> No Item
<br /> Unit Est.Qty Unit Price Total
<br /> Mobilization LS 1
<br /> Tem orar Water Supply $201,800.00 $201,800.00
<br /> LS 1 $58,000.00 $58,000.00
<br /> construction Surveying LS 1
<br /> 4 Traffic Control $65,200.00 $65,200.00
<br /> S Temporary Erosion and
<br /> LS 1 $20,400.00 $20,400.00
<br /> Sedimentation Control LS 1 $27,500.00
<br /> $27,500.00
<br /> 6 Construct Temporary Construction
<br /> Entrance EA 2 $2,150.00
<br /> $4,300.00
<br /> _7 Cleaning and Grubbing ACRE 18
<br /> 8 Remove Existin Drainage S stem LS 1 $5,400.00 $97,200.00
<br /> $27,300.00 $27,300.00
<br /> 9 Disconnect, Protect and Reconnect
<br /> Existing Leachate Piping LS 1 $4,560.00
<br /> $4,560.00
<br /> 10 Remove Existing Temporary
<br /> Geos nthetic Slope Protection LS 1 $3,510.00 $3,510.00
<br /> Disposal of Geosynthetic Slope
<br /> 11 Protection and Drainage Materials LS 1
<br /> $4,560.00 $4,560.00
<br /> On-Site
<br /> 12 Removal of Existing Landfill Gas Wells EA 6
<br /> $325.00 $1,950.00
<br /> 13 Removal of Existing Landfill Gas Vents EA 18
<br /> $325.00 $5,850.00
<br /> 14 Excavate and Stockpile Existing I* --
<br /> Ve etative Soil La er CY 46,020 $2.68 $123,333.60
<br /> 15 Excavate and Stockpile Existing
<br /> Monolithic Clay Layer CY 48,070 $2.55 $122,578.50
<br /> 16 Excavate and Stockpile Existing
<br /> Foundation La er CY 18,025 $2.55 $45,963.75
<br /> 17 Excavate, Relocate and Compact
<br /> Refuse CY 105,975 $3.94 $417,541.50
<br /> 18 Excavate, Process and Stockpile On-
<br /> site Borrow CY 60,000 $8.20 $492,000.00
<br /> 19 Import Material from Off-Site Mine CY 15,000 $5.30
<br /> $79,500.00
<br /> 20 Pre are Buttress Foundation CY 850 $5.70
<br /> 21 Construct Buttress CY 37,500 $4,845.00
<br /> $2.90 $108,750.00
<br /> 22 Place and Compact Foundation Layer CY 40,398
<br /> $6.50 $262,587.00
<br /> 23 Install Passive Landfill Gas Wells VLF 700 $83.00
<br /> $58,100.00
<br /> 24 Passive LFG Vent/Well Surface
<br /> Com letions EA 50 $290.00 $14,500.00
<br /> 25 Install Passive Landfill Gas Trenches
<br /> and Vents LF 8,000 $26.10 $208,800.00
<br /> Install Low Permeability Barrier(40-
<br /> 1,.
<br /> mil Textured LLDPE Geomembrane) SF 726,462 $0.48 $348,701.76
<br /> Install Geocomposite Drainage Layer
<br /> Double-Sided SF 726,462 $0.70 $508,523.40
<br /> 'ROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\13oston Pacific
<br />
|