Laserfiche WebLink
Guinn Construction Bid Sheet <br />Supplement <br />Worksheet Conversion from Sq Ft to Cy <br />• Item No. 6 from Guinn Construction bid sheet dated 5/19/08 for FU -08 calculation for conversion to cubic yard <br />cost <br />(326,300 x 2= 652,600 c ft/ 27 = 24,170 c y <br />163,150 / 24,170 = $6.75) <br />11 <br />11 <br />