kxuinn Construction
<br />6533 Rosedale 1-Iwy.
<br />Bakersfield, CA 93308
<br />U.S.A.
<br />To:
<br />Allied Waste Industries
<br />Address:
<br />901 Bailey Road
<br />02
<br />Pittsburg, CA 94665
<br />Project Name:
<br />Forward FU -08
<br />Project Location:
<br />Delineated, Such As Termination Berm, Access Ramp,
<br />' Item #
<br />Item Description
<br />01
<br />Mobilization/ Demobilization
<br />02
<br />Provide Excavation Of WMU FU -08
<br />03
<br />Provide General Earthfill (in All Areas Not Otherwise
<br />$7,500.00
<br />Delineated, Such As Termination Berm, Access Ramp,
<br />$60.00
<br />Etc.)
<br />$0.05
<br />Includes Stripping Overburden From Borrow (20,000
<br />$0.15
<br />Cy)
<br />04
<br />Provide Subgrade Fill (above existing cover soil and
<br />$30.00
<br />refuse)
<br />05
<br />Provide Grading And Subgrade Preparation
<br />06
<br />Provide Clay Liner - Ton cell floor
<br />07
<br />Provide Granular Drainage Material (Southern Portion)
<br />08
<br />Provide 6 -inch Diameter SDR 11 HDPE Leachate
<br />Collection Pipe (Perforated)
<br />09
<br />Provide HDPE Tanks
<br />10
<br />Provide Coarse Gravel
<br />I I
<br />Install Filter Geotextile Material
<br />12
<br />0
<br />Install Protective Operations Layer - Floor + 10' on
<br />sloe p
<br />Provide Bench Berm (Section G)
<br />14
<br />Provide Slope Anchor Trench Excavation And Slurry
<br />Cement Trenc as h BUIS(ection E)
<br />15
<br />Provide Eastern Termination Bern (Section C)
<br />16
<br />Provide Clay Earthfill Berm (Section D)
<br />17
<br />Provide Perimeter Berm (Section Q)
<br />18
<br />Provide Gen Earthfill Around HDPE Tanks (Sections J, K)
<br />19
<br />Relocate Existing Channel
<br />20
<br />Provide 4'x 8'x 1/4" Plywood Sheeting
<br />Owner Furnished Materials
<br />21 Deduct For Owner Furnished HDPE Pipe
<br />22 Deduct For Owner Furnished HDPE Tanks
<br />Notes:
<br />�J
<br />Phone: (661)325-6109
<br />Far. (661)325-5173
<br />Contact:
<br />Phone:
<br />Fax:
<br />Bid Number:
<br />Bid Date:
<br />Estimated Quantity Unit
<br />1.00 LS
<br />21,200.00 Cy
<br />46,800.00 Cy
<br />160,500.00 SF
<br />471,900.00 SF
<br />326,300.00 SF
<br />314,400.00 SF
<br />2,350.00 LF
<br />3.00 EACH
<br />725.00 CY
<br />314,400.00 SF
<br />329,300.00 SF
<br />600.00 LF
<br />250.00 LF
<br />Lochlin Caffey
<br />925-458-9800
<br />925-458-9891
<br />Unit Price
<br />Total Price
<br />$62,000.00
<br />$62,000.00
<br />$2.15
<br />$45,580.00
<br />$2.15
<br />$100,620.00
<br />$0.40 $64,200.00
<br />$0.10
<br />$47,190.00
<br />$0.50
<br />$163,150.00
<br />$1.40
<br />$440,160.00
<br />$16.00
<br />$37,600.00
<br />$7,500.00
<br />$22,500.00
<br />$60.00
<br />$43,500.00
<br />$0.05
<br />$15,720.00
<br />$0.15
<br />$49,395.00
<br />$20.00
<br />$12,000.00
<br />$30.00
<br />$7,500.00
<br />930.00
<br />LF
<br />$22.00
<br />$20,460.00
<br />400.00
<br />LF
<br />$20.00
<br />$8,000.00
<br />535.00
<br />LF
<br />$18.00
<br />$9,630.00
<br />1.00
<br />LS
<br />$9,000.00
<br />$9,000.00
<br />1.00
<br />LS
<br />$7,500.00
<br />$7,500.00
<br />1.00
<br />LS
<br />$5,000.00
<br />$5,000.00
<br />Total Price for above Items:
<br />$1,170,705.00
<br />1.00 LS ($21,279.07) ($21,279.07)
<br />1.00 LS ($10,037.21) ($10,037.21)
<br />Total Price for above Owner Furnished Materials Items:
<br />($31 316 28)
<br />Total Bid Price: $1,139,388.72
<br />• No provision has been made to extend the LFG Collector Pipe
<br />• Geosynthetics to be furnished and installed by others with the exception of the filter geotextile which is to be furnished by
<br />others and installed by Guinn.
<br />• Geogrid to be furnished and installed by others.
<br />• We reserve the right to renegotiate unit prices for direct cost increases arising from rising fuel prices.
<br />• No provision has been made to provide a performance & payment bond.
<br />so
<br />Highlighted unit prices were utilized in the Forward Landfill Closure Cost Estimate — Table 3 of PCPCMP Amendment No. 3. See
<br />Attached worksheet for conversion/calculation of item No. 6.
<br />5/19/2008 12:29:58 PM
<br />Page] of 2
<br />
|