Laserfiche WebLink
kxuinn Construction <br />6533 Rosedale 1-Iwy. <br />Bakersfield, CA 93308 <br />U.S.A. <br />To: <br />Allied Waste Industries <br />Address: <br />901 Bailey Road <br />02 <br />Pittsburg, CA 94665 <br />Project Name: <br />Forward FU -08 <br />Project Location: <br />Delineated, Such As Termination Berm, Access Ramp, <br />' Item # <br />Item Description <br />01 <br />Mobilization/ Demobilization <br />02 <br />Provide Excavation Of WMU FU -08 <br />03 <br />Provide General Earthfill (in All Areas Not Otherwise <br />$7,500.00 <br />Delineated, Such As Termination Berm, Access Ramp, <br />$60.00 <br />Etc.) <br />$0.05 <br />Includes Stripping Overburden From Borrow (20,000 <br />$0.15 <br />Cy) <br />04 <br />Provide Subgrade Fill (above existing cover soil and <br />$30.00 <br />refuse) <br />05 <br />Provide Grading And Subgrade Preparation <br />06 <br />Provide Clay Liner - Ton cell floor <br />07 <br />Provide Granular Drainage Material (Southern Portion) <br />08 <br />Provide 6 -inch Diameter SDR 11 HDPE Leachate <br />Collection Pipe (Perforated) <br />09 <br />Provide HDPE Tanks <br />10 <br />Provide Coarse Gravel <br />I I <br />Install Filter Geotextile Material <br />12 <br />0 <br />Install Protective Operations Layer - Floor + 10' on <br />sloe p <br />Provide Bench Berm (Section G) <br />14 <br />Provide Slope Anchor Trench Excavation And Slurry <br />Cement Trenc as h BUIS(ection E) <br />15 <br />Provide Eastern Termination Bern (Section C) <br />16 <br />Provide Clay Earthfill Berm (Section D) <br />17 <br />Provide Perimeter Berm (Section Q) <br />18 <br />Provide Gen Earthfill Around HDPE Tanks (Sections J, K) <br />19 <br />Relocate Existing Channel <br />20 <br />Provide 4'x 8'x 1/4" Plywood Sheeting <br />Owner Furnished Materials <br />21 Deduct For Owner Furnished HDPE Pipe <br />22 Deduct For Owner Furnished HDPE Tanks <br />Notes: <br />�J <br />Phone: (661)325-6109 <br />Far. (661)325-5173 <br />Contact: <br />Phone: <br />Fax: <br />Bid Number: <br />Bid Date: <br />Estimated Quantity Unit <br />1.00 LS <br />21,200.00 Cy <br />46,800.00 Cy <br />160,500.00 SF <br />471,900.00 SF <br />326,300.00 SF <br />314,400.00 SF <br />2,350.00 LF <br />3.00 EACH <br />725.00 CY <br />314,400.00 SF <br />329,300.00 SF <br />600.00 LF <br />250.00 LF <br />Lochlin Caffey <br />925-458-9800 <br />925-458-9891 <br />Unit Price <br />Total Price <br />$62,000.00 <br />$62,000.00 <br />$2.15 <br />$45,580.00 <br />$2.15 <br />$100,620.00 <br />$0.40 $64,200.00 <br />$0.10 <br />$47,190.00 <br />$0.50 <br />$163,150.00 <br />$1.40 <br />$440,160.00 <br />$16.00 <br />$37,600.00 <br />$7,500.00 <br />$22,500.00 <br />$60.00 <br />$43,500.00 <br />$0.05 <br />$15,720.00 <br />$0.15 <br />$49,395.00 <br />$20.00 <br />$12,000.00 <br />$30.00 <br />$7,500.00 <br />930.00 <br />LF <br />$22.00 <br />$20,460.00 <br />400.00 <br />LF <br />$20.00 <br />$8,000.00 <br />535.00 <br />LF <br />$18.00 <br />$9,630.00 <br />1.00 <br />LS <br />$9,000.00 <br />$9,000.00 <br />1.00 <br />LS <br />$7,500.00 <br />$7,500.00 <br />1.00 <br />LS <br />$5,000.00 <br />$5,000.00 <br />Total Price for above Items: <br />$1,170,705.00 <br />1.00 LS ($21,279.07) ($21,279.07) <br />1.00 LS ($10,037.21) ($10,037.21) <br />Total Price for above Owner Furnished Materials Items: <br />($31 316 28) <br />Total Bid Price: $1,139,388.72 <br />• No provision has been made to extend the LFG Collector Pipe <br />• Geosynthetics to be furnished and installed by others with the exception of the filter geotextile which is to be furnished by <br />others and installed by Guinn. <br />• Geogrid to be furnished and installed by others. <br />• We reserve the right to renegotiate unit prices for direct cost increases arising from rising fuel prices. <br />• No provision has been made to provide a performance & payment bond. <br />so <br />Highlighted unit prices were utilized in the Forward Landfill Closure Cost Estimate — Table 3 of PCPCMP Amendment No. 3. See <br />Attached worksheet for conversion/calculation of item No. 6. <br />5/19/2008 12:29:58 PM <br />Page] of 2 <br />