|
Earthwork
<br />Grain Size
<br />Atterbefgs - Plastic Limit
<br />Atterbergs - Plasticit Index
<br />Proctor (Moisture - Density I
<br />Permeability (flexible wall)
<br />Permeability (rigid wall)
<br />thetics
<br />Thickness
<br />Density
<br />Stress Crack Resistance
<br />Tear Resistance
<br />Puncture Resistance
<br />Carbon Black Content
<br />Carbon Black Dispersion
<br />Tensile Strength at Yield
<br />Destructive Seam Test
<br />Mass per Unit Area
<br />A parent Opening Size
<br />Puncture Resistance
<br />Resin Density.
<br />Grab Strength
<br />Tensile Strength and Elon
<br />Compression Behavior
<br />Resin Melt Index
<br />Transmissivitv
<br />Unit Price
<br />140
<br />P60
<br />115
<br />130
<br />265
<br />225
<br />$70
<br />$70
<br />F112
<br />X250
<br />>392
<br />>392
<br />;266
<br />;266
<br />X448
<br />3,400
<br />112
<br />770
<br />630
<br />392
<br />112
<br />M
<br />E
<br />Allikk
<br />tt ent 2
<br />CQA Laboratory costs
<br />Fre uenc uantit Cubic Y
<br />Found/Veg Lave
<br />1 Test
<br />per 5,000 �
<br />1 Test
<br />per 5,000 c
<br />1 Test
<br />per 5,000 c
<br />1 Test
<br />per 10,000
<br />1 Test
<br />per 10,000
<br />1 Test per 10,000
<br />1 Test
<br />per 100,000 s
<br />42
<br />1 Test
<br />Per 100,000 s
<br />M2,9
<br />1 Test
<br />per 100,000 s
<br />42
<br />1 Test
<br />Per 100 000 s
<br />$16,449
<br />1 Test
<br />er 100,000 s
<br />42
<br />1 Test
<br />er 100,000 s
<br />"4$
<br />1 Test
<br />er 100 000 s
<br />4
<br />1 Test
<br />or 100,000 s
<br />$1,645
<br />1 Test
<br />per 100,000 s
<br />4
<br />1 Test
<br />per seam
<br />$2 056
<br />1 Test
<br />er 100,000 s
<br />ft
<br />1 Test
<br />er 100,000 s
<br />ft
<br />1 Test
<br />per 100,000 sq
<br />ft
<br />1 Test
<br />per 100,000 sq
<br />ft
<br />1 Test
<br />per 100,000 sq
<br />ft
<br />1 Test
<br />per 100,000 sq
<br />ft
<br />1 Test
<br />per 100,000 sq
<br />ft
<br />1 Test per
<br />100,000 sq
<br />ft
<br />1 Test per
<br />100,000 sq
<br />ft
<br />1 Test per 100,000 sq ft
<br />921,189
<br />temorane
<br />4,196,248
<br />4,196,248
<br />4,196, 248
<br />4,196, 248
<br />4,196,248
<br />4,19-
<br />4,196,248
<br />4 196 248
<br />4,196 248
<br />209,715
<br />CIS/Square Feet/If No. Of T
<br />Low Perm Layer
<br />i 155,576
<br />155,576
<br />155,576
<br />155, 576
<br />155,5766
<br />155,576
<br />Earthwork Subtotals
<br />Geocomposite Drains
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />419624
<br />nthetic Subtotal
<br />Notes: Test frequency in accordance with Geosynthetic Research Institute, test unit pricing from Geologic Associates, Cost
<br />Z:\PROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\CQA Lab Cost back-up
<br />31
<br />31
<br />31
<br />108
<br />16
<br />16
<br />Test Subtotals
<br />$4,356
<br />$1,867
<br />$3,578
<br />13,998
<br />$4,123
<br />$3,500
<br />31- ,422
<br />42
<br />42
<br />42
<br />M2,9
<br />42
<br />42
<br />$16.t449
<br />42
<br />$16,449
<br />42
<br />$11 162
<br />42
<br />"4$
<br />,
<br />4
<br />$2,644
<br />4
<br />$1,645
<br />4
<br />$470
<br />4
<br />$1,880
<br />4
<br />$2 056
<br />4
<br />$2,644
<br />4
<br />$2,056
<br />4
<br />$3 525
<br />$187,010
<br />c
<br />
|