Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS -16- <br /> FORWARD INC.,FORWARD LANDFILL <br /> SAN JOAQUIN COUNTY ` <br /> LAND TREATMENT UNIT SPECIFICATIONS <br /> 26. WMU G, a land treatment unit, may be sited at any point in the area described in <br /> Attachment B. WivfU G may not overlay any existing elements of a WMU. Design and <br /> construction plans shall be submitted to Board staff for approval before construction of <br /> any land treatment unit. <br /> 27. As site conditions change,WMU G may be shifted to another point in the area described <br /> in Attachment B. The new location must be approved by Board staff. <br /> 28. Each old location of WMU G must be closed according to Chapter 15. Closure shall <br /> include testing of the old location for the parameters described in the land treatment <br /> section of Monitoring and Reporting Program No.97-141. <br /> 29. The maximum depth of the treatment zone shall not exceed five feet from the initial soil <br /> surface. <br /> 30. Treated soil from WMU G shall be used as alternative daily cover in compliance with Title <br /> 14, foundation material for final cover, or discharged to a landfill unit in compliance with <br /> this Order. <br /> 31. Soil piles stored in WMU G shall at all times be completely covered with a synthetic liner, <br /> except during treatment. <br /> 32. Soils containing contaminants other than petroleum hydrocarbons and BTEX(for <br /> example, chlorinated hydrocarbons) shall not be placed in WMU G without prior approval <br /> of the Executive Officer. <br /> 33. WMU G shall be grbLded so that storm water runoff is collected within the unit for <br /> appropriate disposal. <br /> WASTE PILE SPECIFICATIONS <br /> 34. Waste piles constructed for treatment of petroleum contaminated soils shall be within the <br /> area designated for WMU G. Design and construction plans and specifications shall be <br /> submitted to Board staff for approval before construction of any waste pile. After <br /> construction, a construction quality assurance report shall be submitted and approved by <br /> Board staff prior to operation of the waste pile. <br /> f - <br />