Laserfiche WebLink
1.0 INTRODUCTION <br /> 1.1 PURPOSE <br /> This Preliminary Closure/Post-Closure Maintenance Plan (PCPCMP) for the <br /> Forward Landfill has been prepared as an appendix to the Joint Technical <br /> Document (JTD) for submittal to the California Integrated Waste Management <br /> Board (CIWMB), the County of San Joaquin Environmental Health Department <br /> (Local Enforcement Agency [LEA]), and the Regional Water Quality Control <br /> Board (RWQCB) on behalf of Forward, Inc. (Forward), the owner/operator of the <br /> landfill, by Bryan A. Stirrat & Associates (BAS) and Lewis Engineering. <br /> Closure of the Forward Landfill will be performed in accordance with the <br /> applicable regulatory standards included in California Code of Regulations, <br /> Title 27 (27 CCR), Chapters 3 and 4 and 40 Code of Federal Regulations (CFR), <br /> Subpart F. The purpose of this section of 27 CCR is to develop sufficient <br /> information regarding the proposed closure design and post-closure <br /> maintenance activities to estimate the associated costs. The estimated costs will <br /> then become the basis for properly funding the Forward Landfill closure and <br /> post-closure maintenance financial assurance account. <br /> The improvements and systems required for closure of the Forward Landfill <br /> include the final grading, final cover system, drainage and erosion control <br /> systems, landfill gas monitoring/control system, leachate control system, site <br /> security, structure removal, and modification of environmental control systems <br /> (during final cover placement). A description of these closure improvements as <br /> well as a schedule for closure construction of the Forward Landfill is presented in <br /> the following sections. <br /> The sections titled Introduction (Section 1.0) and Existing Environmental Control <br /> and Monitoring Systems (Section 2.0) of this document present information <br /> which is common to both the Closure Plan (Section 3.0) and Post-Closure <br /> Maintenance Plan (Section 4.0). The Post-Closure Emergency Response Plan <br /> and Closure/Post-Closure Maintenance Cost Estimates are presented in Sections <br /> Forward Landfill PCPCMP 1-1 <br /> L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-secl.doc:05/21/02 <br /> BRYAN A.STIRRAT S ASSOCIATES <br />