Laserfiche WebLink
TOR <br /> ENGINEERING, INC. <br /> 0 DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 47 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWT August 22, 2008 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> Lw/ <br /> n-Site light tan cla a soil warm and breezy Aaron Lickin teller <br /> uipment on site: <br /> 5 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> slo e-board,excavator,623 scraper, 16 G Motograder, 825 com actor,smooth drum roller,backhoe,2 forklifts <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Geocomposite placement was approved after Comanco and Vector personnel inspected the HDPE <br /> membrane on the northwestern 2:1 and 5:1 slopes. <br /> - Geosynthetics deployment included 57,400 square feet of single-sided geocomposite placed on the <br /> northwestern slopes. <br /> eEr:epa:r�edBy. Reviewe�Br. <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />