Laserfiche WebLink
'TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 49 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI Au ust 26, 2008 Tuesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site li ht tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slope-board,excavator,623 scra er, 16 G Motograder,825 compactor,smooth drum roller,backhoe,2 forklifts <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - The initial leak location procedure was concluded after it was performed on the final portion of he <br /> floor(northern two-thirds, including the three sumps and the northern LCRS ditch). <br /> - Two locations were identified as needing repair after the clay beneath the liner had moisturized and <br /> hardened into boulder sized particles. The location of each was marked on the liner to insure that <br /> each particle would be removed the following day by Comanco. <br /> • Prepared By: Reviewed By:d L <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />