Laserfiche WebLink
TIECTOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 58 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWl September 5, 2008 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slope-board,excavator,623 scra er, 16 G Motograder,825 com actor,smooth drum roller,backhoe,735 rock truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn filled the east side slope anchor trench with slurry. <br /> - Guinn began covering the cell floor northward of the south leachate ditch using a 627 scraper and a <br /> D-6 dozer. Pea gravel operations on the geotextile were ceased due to unforeseen maintenance issues <br /> and the need to dry the pea gravel, which was brought on-site wet. The rest of the day was spent <br /> sifting the gravel with a loader to rid it of moisture. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 2 <br /> C-2 <br />