Laserfiche WebLink
Fc"TOR <br /> INEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 63 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI September 12,2008 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry Jose Ramirez <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers,2 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer w/slope- <br /> board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe,2 x 735 rock trucks, I forklift <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn covered the northeast corner of the cell floor with pea gravel. One 627 scraper and one D-6 <br /> dozer was used in the process. <br /> - The middle and southern sumps were completed after their tanks were wrapped with geotextile. <br /> - Comanco personnel arrived and repaired the liner puncture that occurred on September 10. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />