My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2008_27
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2008_27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:28 PM
Creation date
7/3/2020 10:54:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2008_27
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2008_27.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WMU FU-08 October 2008 <br /> Forward Landfill Project No. 021605.08, <br /> are included in various appendices of this report. Documentation of the <br /> conformance tests for the geosynthetic components is also presented. <br /> 3.3 Design Modifications <br /> During the construction of WMU FU-08, modifications to the contract drawings and <br /> specifications occurred. The approved modifications during construction of WMU <br /> FU-08 are included in Appendix O. <br /> 3.4 Final Report <br /> Preparation of this final report documenting project CQA activities was the final <br /> task of the CQA program for the Forward Landfill, WMU FU-08 composite liner <br /> system construction project. This report includes discussions of the findings and <br /> observations of the on-site CQA personnel regarding the activities identified above. <br /> The documentation of construction and CQA activities are presented on the field <br /> logs prepared by the CQA personnel, which are included as appendices to this final <br /> report. Also presented in the appendices of this final report are the results of <br /> laboratory conformance tests conducted on earthworks and geosynthetic materials. <br /> The report contains a discussion of the CQA procedures performed by Vector, a <br /> discussion of the construction activities, and a description of the composite liner <br /> system components observed and tested by Vector. <br /> Photographic documentation of this project was maintained by Vector <br /> throughout the construction period; select photos are presented in <br /> Appendix A. <br /> 0 Daily field reports of CQA activities are included in Appendix B. <br /> 0 Earthworks documentation is included in Appendices C through G. <br /> 0 Geosynthetics documentation is included in Appendices H through L. <br /> 0 HDPE piping documentation is included in Appendix M. <br /> 0 Certification survey data and as-built drawings are included in <br /> Appendix N. <br /> ® Design modifications are included in Appendix O. <br /> Vector Engineering, Inc. - 143E Spring Hill Drive-Grass Valley, CA 95945-(530)272-2448 <br /> -6- <br />
The URL can be used to link to this page
Your browser does not support the video tag.