Laserfiche WebLink
SIGNATURE PAGE <br /> Vector Engineering, Inc. (Vector) provided construction quality assurance services <br /> during the construction of WMU FU-08, at the Forward Landfill. The following final <br /> construction certification report was prepared by Vector and is hereby submitted to <br /> the Regional Water Quality Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and <br /> geosynthetic engineering practices applicable at the time the report was prepared. <br /> Vector makes no other warranties, either expressed or implied, as to the <br /> professional advice provided under the terms of this agreement, and as described in <br /> this report. Our recommendations consist of professional opinions and conclusions <br /> based on our testing and inspection program performed during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, <br /> the WMU FU-08 liner system at the Forward Landfill has been constructed and <br /> completed in general accordance with the project plans and specifications. During <br /> the construction, Vector conducted observations and testing to determine that the <br /> construction was conducted in general accordance with the project plans and <br /> specifications. The conclusions of our observations and testing, together with a <br /> written narrative describing the personnel, scope, methods, procedures and results <br /> of our CQA services, have been included in this certification report. <br /> VECTOR ENGINEERING INC. <br /> CWW <br /> co <br /> Monte A. Christie, PE, GE 6 3d °7 <br /> No 058866 <br /> CQA Engineer P Q. <br /> ��0f C 11�� <br />