Laserfiche WebLink
® T 4. <br />SEAM PEEL ARID SHEAR TEST RESULTS 4�450 <br />CLIENT: VECTOR ENGINEERING <br />PROJECT: Forward Landfill <br />DATE RECD: 20 -Aug -08 <br />MATERIAL: HDPE SEAM <br />SEAM TYPE. Fusion Weld <br />PGL JOB #: G081049 <br />QC'd By. <br />TEST METHOD: ASTM D6392 <br />DATE REPORT: 20 -Aug -08 <br />Crosshead Speed: 2 Wmin Crosshead Speed: 2 in/min <br />SHEAR EVALUATION PEEL EVALUATION <br />MAXIMUM % Locus PROJECT MAXIMUM % LOCUS PROJECT <br />SAMPLE PGL STRENGTH Elongation of SPEC. SPECIMEN STRENGTH INCURSION OF SPEC. <br />ID CONTROL # Qhn widthl Break Obfin width NUMBER Q110 width % BREAK /bin width <br />DS -D19 <br />49965 <br />205 <br />> 50% <br />BRK <br />1 Outside <br />130 <br />0 <br />SE1 <br />AD-BRK <br />D64/65 <br />SE3 <br />213 <br />> 50% <br />BRK <br />2 Outside <br />130 <br />0 <br />SE1 <br />AD-BRK <br />204 <br />> 50% <br />BRK <br />3 Outside <br />128 <br />0 <br />SE1 <br />205 <br />> 50% <br />BRK <br />4 Outside <br />132 <br />0 <br />SE1 <br />205 <br />> 50% <br />BRK <br />5 Outside <br />132 <br />0 <br />SE1 <br />130 <br />AVG: <br />STD. DEV. <br />2 <br />1Inside <br />142 <br />0 <br />SE1 <br />2Inside <br />146 <br />0 <br />SE1 <br />3lnside <br />142 <br />0 <br />SE1 <br />4lnside <br />142 <br />0 <br />SE1 <br />5lnside <br />148 <br />0 <br />SE1 <br />AVG. <br />206 <br />AVG: <br />144 <br />STD. DEV. <br />4 <br />STD. DEV. <br />3 <br />DS -D20 <br />49956 <br />203 <br />> 50% <br />BRK <br />1 Outside <br />136 <br />0 <br />SE1 <br />D79/80 <br />204 <br />> 50% <br />BRK <br />2 Outside <br />142 <br />0 <br />SEI <br />212 <br />> 50% <br />BRK <br />3 Outside <br />148 <br />0 <br />SE1 <br />209 <br />> 50% <br />BRK <br />4 Outside <br />138 <br />0 <br />SE1 <br />213 <br />> 50% <br />BRK <br />5 Outside <br />140 <br />0 <br />SE1 <br />AVG: <br />141 <br />STD. DEV. <br />5 <br />1Inside <br />148 <br />0 <br />SE1 <br />2Inside <br />148 <br />0 <br />SE1 <br />3lnside <br />150 <br />0 <br />SE1 <br />4lnside <br />144 <br />0 <br />SE1 <br />5lnside <br />142 <br />1 0 <br />1 SE1 <br />AVG: <br />208 <br />AVG: <br />146 <br />STD. DEV. <br />S <br />STD. DEV. <br />3 <br />BREAK DESCRIPTION (ASTM D6392 FU EXTRUSION: <br />ADI <br />AD <br />ADHESION FAILURE. <br />AD2 <br />BRK <br />BREAK IN SHEETING. <br />AD-WLD <br />SEI <br />BREAK AT OUTER EDGE OF SEAM. <br />SEI <br />SE2 <br />BREAK AT INNER EDGE OF SEAM. <br />SE2 <br />AD-BRK <br />BREAK IN FIRST SEAM AFTER SOME ADHESION FAILURE. <br />SE3 <br />SIP <br />SEPARATION IN THE PLANE OF THE SHEET. <br />BRK1 <br />BRK2 <br />AD-BRK <br />HT <br />ADHESION FAILURE. SPECIMENS DELAMINATED UNDER THE BEAD, <br />ADHESION FAILURE. <br />BREAK THROUGH THE FILLET. <br />BREAK AT BOTTOM EDGE OF SEAM. <br />BREAK AT TOP EDGE OF SEAM. <br />BREAK AT BOTTOM EDGE OF SEAM (for PEEL only) <br />BREAK IN BOTTOM SHEETING. <br />BREAK IN TOP SHEETING. <br />BREAK IN FIRST SEAM AFTER SOME ADHESION FAILURE. <br />BREAK AT EDGE OF HOT TACK <br />SIP SEPARATION IN THE PLANE OF THE SHEET. <br />Precision Geosynthetic Laboratories <br />121 1-yaw1 <br />