Laserfiche WebLink
1-1 <br />Geoelectric Leak Detection Final Report September 18, 2008 <br />Forward Landfill WU-08 Page 4 <br />2 <br />1.5 <br />1 <br />0.5 <br />9 <br />0 <br />0 <br />-0.5 <br />_1 <br />-1.5 <br />Calibration Curve <br />Meters <br />Results <br />No electrical anomalies were located in the FU -08 expansion. <br />— Background <br />—114" Hole <br />If you have any questions, please contact the undersigned at (530) 272-2448. <br />Regards, <br />VECTOR <br />ENGINEERING, <br />INC. <br />Abigail Beck, PE <br />Manager of Geoelectric Services <br />l It <br />Monte A. Christie, P.E., G.E. <br />Project Manager <br />143E Spring Hill Drive • Grass Valley, California 95945 • (530) 272-2448 • Fax: (530) 272-8533 <br />USA a CENTRAL & sourll AMERICA 0 PHILIPPINES <br />