TOR <br /> VE <br /> INEERING INC. <br /> DAILY CONSTRUCTION FIELD E T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 14 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI July 7,2008 Monday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 140 H motograder <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is using a D-6, 140 H Motograder, 637 scraper, 627 scraper, and a 623 scraper(all with GPS) <br /> to grade the cell floor(including digging LCRS trenches). <br /> - Guinn is placing earthfill in the southwest corner of the cell to bring that area to grade. The material <br /> is removed by scrapers from the excavation area,watered, and compacted with an 815 compactor. <br /> Guinn is ripping and wetting the west side of the excavation area with a -6, a tractor with discs, and <br /> a water truck. The material is being conditioned for a clay test area that will be constructed <br /> tomorrow. CQA performed microwave moisture checks for the contractor to control moisture <br /> conditioning. <br /> - CQA monitored grading,moisture conditioning and compaction of earthfill. <br /> 9FPrepared By: Reviewed By: 7 <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />