Laserfiche WebLink
Vc"TOR <br /> NGINEERING INC. <br /> DAILYCONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 23 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AW1 July 23,2008 Wednesda <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn C®manC® <br /> Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan clayey soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc, 5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 16 G Motograder,825 coin actor <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn is ripping and wetting the excavation area with a D-6, a tractor with discs, a Motograder, and a <br /> water truck. CQA monitored moisture and composition of borrow material. <br /> - Guinn placed low permeability soil from the borrow area,into the cell from north to south. The <br /> material was placed at a minim of 6%above optimum as per the recommendations of CQA. The <br /> material was placed in 8"loose lifts(6"compacted)as per the specifications. The material was <br /> compacted with an 825 compactor and an 815 compactor. Guinn finished the third lift early and is <br /> working on the fourth lift. <br /> - Guinn cut subgrade fill on the north-slope to grade with the 16 G Motograder. <br /> - CQA monitored moisture conditioning,placement, and compaction of the low permeability soil. <br /> - CQA performed fifteen(15)passing nuclear density tests and removed one(1)field permeability <br /> sample. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />