Laserfiche WebLink
Vc"TOR <br /> NGINEERING 11YC. <br /> ® DAILY CONSTRUCTION FIEL T <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 30 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca,CA Forward/AW1 August 1, 2008 1 Friday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> L <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan cla a soil Hot and breezy Evan Lindenbach <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slo e-board,excavator,623 scra er, 16 G Motograder, 825 comIMetor,smooth drum roller,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn is using GPS and a grade checker to monitor the grade of placed material. <br /> - Guinn watered the completed low permeability soil surface with two water trucks. <br /> - Guinn worked on creating a stockpile area for drainage material as they arrive on-site. <br /> - CQA monitored moisturizing of low permeability soil surface. <br /> Prepared By: Reviewed By: <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />