Laserfiche WebLink
1,7E "TOR <br /> ENGINEERING,INC. <br /> DAILY CONSTRUCTION FIELD REPORT <br /> Project Name: Project No. Daily Field Report Sequence Number: <br /> Forward Landfill 2008 021605.08 33 <br /> Location of Work: Client Or Manager Date: Day of The Week: <br /> Manteca, CA Forward/AWI August 6, 2008 Wednesday <br /> General Contractor: Liner Contractor: Project Engineer: <br /> Guinn Comanco Lewis Engineering <br /> General Foreman: Liner Superintendent: Other: <br /> Larry <br /> Source and Description of Fill Material: Weather: CQA Technician: <br /> On-Site light tan cla ey soil Warm and breezy Aaron Lickingteller <br /> Equipment on site: <br /> 815 compactor,tractor with BeGe blade and disc,5 x 637 scrapers, 1 x 627 scraper,2 x water trucks,D-6 dozer,D-6 dozer <br /> w/slope-board,excavator,623 scraper, 16 G Motograder,825 compactor,smooth drum roller,backhoe <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> - Guinn watered the completed low permeability soil surface with two water trucks. <br /> - Guinn continued working on the stockpile area to be used for drainage material as it arrives on-site. <br /> - CQA monitored moisturizing of low permeability soil surface. <br /> Prepared By: Reviewed By: <br /> I Al <br /> 4/23/03,Rev.0 1 of 1 <br /> C-2 <br />