Laserfiche WebLink
ti <br /> RE: FORWARD LANDFILL(SWIS No. 39-AA-0015) <br /> AMENDMENT NO.3 TO 2002 PRELIMINARY CLOSURE/POST- <br /> CLOSURE MAINTENANCE PLAN <br /> November 18,2008 <br /> Page 2 of 2 <br /> Finally, Amendment No. 4 was submitted in July 2008, as part of the Five-Year Permit <br /> Review to provide updated PCPCMP cost estimates and newly required back-up for those <br /> estimates. PCPCMP Amendment No. 4 was recently accepted by the Local Enforcement <br /> Agency (LEA) in August 2008. <br /> CLOSURE <br /> SWT submits this document (PCPCMP Amendment No. 3), along with the Solid Waste Facility <br /> Permit(SWFP)Application, as part of Amendment No. 3 to the Joint Technical Document <br /> (JTD) (dated November 2008). The amended PCPCMP is included as Appendix L of JTD <br /> Amendment No. 3. Therefore, PCPCMP Amendments 1 through 4, as discussed above, are <br /> all part of the JTD. <br /> This draft submittal consists of the following: <br /> ♦ Cover Letter <br /> ♦ SWFP Application Form <br /> ♦ JTD Amendment No. 3, which includes PCPCMP Amendment No. 3 (Appendix L of the <br /> JTD) <br /> As we discussed, please review and give me a call to discuss necessary changes to the <br /> package to make it acceptable for filing. <br /> Sincerely, <br /> f pllt� <br /> ?ohn R. Boucher <br /> Principal Planner <br /> c:Lochlin Caffey,Allied Waste Industries <br /> Ruben Ramirez, Forward Landfill, Inc. <br /> Lori Olin,SWT <br /> SWT Engineering <br /> Z:\PROJECTS\Allied Waste\Forward\1N81013 5 yr Review Plan\JTD Amd 3 PCPCMP Amd 3 Nov 08\LSJEHD111408 Amend3 PCPCMP.doc <br />