Laserfiche WebLink
, 1 <br /> Part 3.FACILITY INFORMATION <br /> A.PROPOSED CHANGE(Check applicable box(es)): <br /> 1:11.DESIGN(describe): <br /> ®2.OPERATION(describe): <br /> M3. OWNER,OPERATOR,ADDRESS,AND/OR FACILITY NAME CHANGE(describe): <br /> ā‘āœ“ 4.OTHER(describe): Updated JTD and PCPCMP and updated closure cost estimates and maximum extent ever requiring closure. <br /> B.FACILITY INFORMATION: <br /> 1.INFORMATION APPLICABLE TO ALL FACILITIES <br /> a. PEAK DAILY TONNAGE OR CUBIC YARDS: <br /> 1) DISPOSAL/TRANSFER(unit): 8,668 tons per day(TPD)-Beneficial reuse material quantities listed below are a subset of this peak disposal inflow rate. <br /> In no case will any combination of MSW and the beneficial reuse materials exceed 8,668 TPD. <br /> 2) OTHER(unit) Processed Green Material-1,100 tons,Contaminated Soil-3,200 tons,Beneficial Reuse Inerts-3,000 tons, <br /> Ash and Cement Kiln Dust-172 tons,Treated Auto Shredder Waste-915 tons,and Shredded Tires-215 tons <br /> (refer to JTD Section 4.3.1) <br /> b. DAILY DESIGN TONNAGE(TPD): 8,668 tons <br /> c. FACILITY SIZE(acres): 567 acres <br /> d. PEAK TRAFFIC VOLUME PER DAY(vpd): 620 <br /> e• DAYS AND HOURS OF OPERATION: 4 a.m.to 9:30 p.m.,with waste receipt stopping at 9:00 pm,Monday through Saturday. Also open on ten Sundays per <br /> year from 7 am to 4 pm. The ten Sundays per year that Forward will be open will be selected by Forward based on operational needs.Site closed New Year's <br /> Day and Christmas. <br /> 2.ADDITIONAL INFO.REQUIRED FOR COMPOSTING FACILITIES ONLY <br /> a. SITE STORAGE CAPACITY(cu yds): Not Applicable <br /> 3.ADDITIONAL INFORMATION REQUIRED FOR LANDFILLS ONLY: <br /> a. AVERAGE DAILY TONNAGE(TPD): 5,525 <br /> b. SITE CAPACITY CURRENTLY PERMITTED(Airspace)(cu yds): 51.0 mcy <br /> c. SITE CAPACITY PROPOSED(Airspace)(cu yds): Not Applicable <br /> d. SITE CAPACITY USED TO DATE(Airspace)(cu yds): 27.3 mcy <br /> e. SITE CAPACITY REMAINING(Airspace)(cu yds): 23.7 mcy <br /> f. DATE OF CAPACITY INFORMATION(Date)(See instructions):4/30/2008 <br /> g. LAST PHYSICAL SITE SURVEY(Date): February 2007 <br /> h. ESTIMATED CLOSURE DATE(month and year): February 2017 <br /> i. DISPOSAL FOOTPRINT(acres): 354.5 acres <br /> j. SITE CAPACITY PLANNED(cu yds): Not Applicable <br /> k. 1. (i) IN-PLACE WASTE DENSITY(Ibs of waste per cu yd of waste): 1,740 <br /> AND <br /> (ii)WASTE-TO-COVER RATIO(Estimated)(v:v):4:1 <br /> OR <br /> 2. AIRSPACE UTILIZATION FACTOR(tons of waste per cu yd of landfill airspace): Not Applicable <br /> Part 4.SOURCE OF WATER SUPPLY(Check applicable boxes) <br /> ā‘A. MUNICIPAL OR UTILITY SERVICE: <br /> MB.INDIVIDUAL(wells): <br /> ®C.SURFACE SUPPLY: <br /> 1.NAME OF STREAM,LAKE,ETC. <br /> 2.TYPE OF WATER RIGHTS: <br /> ®RIPARIAN APPROPRIATION <br /> 3. STATE PERMIT OR LICENSE NUMBER,IF APPLICABLE <br /> 2 <br />